As Part Of The Task: Delivery, Installation And Commissioning Of A Power Generator For The Needs Of The Będków Commune As Part Of The Cybersecure Local Government Task. The Subject Of The Order Includes In Particular: Delivery Of A 20Kw/25Kva Power Generator In An Insulated Housing, Adapted To Work Outdoors, Resistant To Weather Conditions. The Structure Of The Generator Container Should Enable Its Independent Installation On A Foundation Slab Or Paved Area, Together With A Tank Ensuring The Operation Of The Generator At Full Load For 24 Hours. The Generator Must Meet The Following Standards: 1.Pn-En 60034-1 Rotating Electrical Machines. Part 1: Ratings And Parameters.2. Pn-En 60947-6-1 Low-Voltage Switchgear And Control Equipment. Part 6-1: Multi-Purpose Connectors. Switching Devices. 3. Pn-En 60255-1 Measuring Relays And Protection Devices - Part 1: Common Requirements. 4. Pn-Iso 8528-1 Ac Generating Sets Powered By A Piston Combustion Engine. Application, Classification And Operational Requirements. 5. Pn-Iso 8528-5 Ac Generating Sets Powered By A Piston Combustion Engine. Generating Sets. 6. En 60034-1 Rotating Electrical Machines - Part 1: Rating And Performance 7. Pn-En 50342-1 Lead-Acid Starting Batteries - Part 1: General Requirements And Test Methods The Generating Set Is To Be Brand New And From Production In 2025, Completely Equipped With Elements To Ensure Proper Operation. The Unit Must Be Equipped With Signaling Of States That Threaten Proper Operation: Measurement Of Oil Pressure, Coolant Temperature, Low Fuel Level, Failed Start. The Operation Of The Unit Should Be Monitored Locally On The Controller Display. The Control Panel Should Be Equipped With At Least: Synoptic Diagram With Integrated Indicators And Control Switches, Automatic On/Off Control, Operating Parameters Monitoring System, Operating Mode Selection Switches, Control And Testing Switches, And Alarm Indicators, Power Supply. All Measuring Devices Of The Generator Set, Security Devices. The Generator Control Panel Must Indicate The Current Fuel Consumption And The Percentage Of Fuel In The Tank. The Generator Must Be Equipped With An Automatic System For Monitoring The Battery Charging Status And A Fault Signaling System. The Unit Should Be Equipped With A Counter For Operating Hours. Technical Parameters Of The Unit: - Designed For Continuous Operation - Fuel Tank Ensuring A Minimum Of 24 Hours Of Operation At Maximum Load - Fuel - Diesel Oil With Parameters In Accordance With Directive 98/70/Ec - Fuel Consumption At Idle Speed Below 4L/H - Fuel Consumption At Maximum Load Below 7.5L/H - Electrical Installation 12V - Avr Voltage Regulator, Ensuring Voltage Stabilization At 230V/400V With Deviations Of +/- 2%. - The Unit Is Equipped With An Automatic Switching On Of The Szr Reserve - Digital Panel For Managing The Unit - Battery - Belt-Driven Alternator - Air Filter, Fuel Filter, Oil Filter - Emergency Safety Switch - Silenced Muffler, - Soundproofed Housing - Electri
Contact Information
Address
Gmina Będków,Będków,97-319,Łódzkie,Pl713 - Piotrkowski
Email
sekretariat@bedkow.com.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105773276
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.