|
Junior Construction Architect With Additional Charges, General Manager With Additional Charges, Supply And Placement Of Construction Sign In Galvanized Sheet #26, Esp. 0.45Mm, Dimension (3X1.5)M, Plotted With Vinyl Adhesive, Affixed With 4.8X40mm Rivets, On 20X20mm Metal Structure, Special. Size (110 X 120 Meters Internal Useful Height, Including Internal Electrical Connections, Exclusive Mobilization / Demobilization And External Temporary Connections, Mobilization And Demobilization Of Container, Including Loading, Unloading And Transport In Truck Body With Crane (Munck), Exclusive Container Rental, Manual Demolition Of Solid Ceramic Brick Masonry, Including Removal And Stacking, Exclusive Transport And Removal Of Demolished Material, Manual Demolition Of Plaster Or Plaster, With A Thickness Of Up To 55Mm, Manual Demolition Of Ceramic Floor Or Hydraulic Tile, Exclusive Demolition Of Subfloor, Transport And Removal Of Demolished Material, Manual Demolition Of Stone Floors (Marble, Granite, Slate, Etc.), Removal Of Doors, Manually, Without Reuse. Af_09/2023, Window Removal, No Reuse. Af_09/2023Removal Of Windows, Manual Demolition Of Cemented Floors Or Mortar Subfloors, With A Maximum Thickness Of 10Cm, Manual Removal Of Commercial Lighting, Built-In Or Above-Ground, With Reuse, Exclusive Of Transportation And Removal Of Non-Reusable Removed Material, Removal Of Crockery (Washbasin, Bathtub, Sink, Vase Sanitary, Tank), Manual Removal Of Stone Countertops (Marble, Marmorite, Including Tear In Masonry, Removal Of Fixing Accessories, Removal And Stacking, Excluding Transport And Removal Of Non-Reusable Removed Materialmanual Removal Of Stone Countertops (Marble, Loading, Maneuvering And Unloading Of Rubble In A 10 M³ Dump Truck - Loading With Hydraulic Excavator (0.80 M³ / 111 Hp Bucket) And Free Unloading (Unit: M3). Board, Batten And Marine Resin Plywood, Thickness 6Mm, Reuse (3X), Exclusive Shoring, Formwork And Shaping Of Plasticized Plywood, Thickness 12Mm, Cutting, Bending And Assembly Of Ca-50 Steel, Diameter (6.3Mm To 12.5Mm), Including Spacer, Bending And Assembly Of Ca-60 Steel, Diameter (4.2Mm To 5.0Mm), Lean Concrete For Ballast, Mixture 1:4, 5:4, 5 (In Dry Mass Of Cement/Medium Sand/Gravel 1) - Mechanical Preparation With 400 L Concrete Mixer. Af_05/2021, Application Of Industrialized Fluid Grout, For Anchors And/Or Recovery In Structural Parts And General Use, Including Preparation In A Concrete Mixer And Casting, Concrete Fck = 25 Mpa - Preparation In A Concrete Mixer And Manual Casting - Sand Extracted And Crushed Stone Produced, Ribbed Lattice With Three Long Bars
|