|
1. The Subject Of The Order Is The Implementation Of An Investment Task Entitled: Development Of The Area Of The Former Shooting Range In Grajewo, Including Green And Blue Infrastructure From The Funds Of The National Fund For Environmental Protection And Water Management Under The European Funds For Eastern Poland Program For 2021-2027.2. The Scope Of The Order Includes The Following Elements: 1) Works In The Field Of Greenery And Green-Blue Infrastructure, Including: A) Greenery: - Cleaning Operations Within The Existing Trees (Including Thinning, Deadwood Removal), - Rain Gardens, - Absorbent Silts, - Filtration Basins, - Plant Passages, - Plantings (Trees, Shrubs, Rows, Hedges, Flowerbeds, Park Undergrowth, Flower Meadows, Lawns), - Irrigation System, B) Retention: - Drainage Installation, - Drainage Installation, - Two Underground, Tight Retention Tanks Made Of Polyethylene, With A Capacity Of 10 M3 Each With Accompanying Infrastructure, - Installation For Infiltrating Retained Rainwater, C) Green Wall With Renovation Of The Shooting Wall (Length 36 M, Height 4.2 M). Steel Supports Should Be Installed On Both Sides Of The Wall In The Form Of A Graphite-Colored Pergola For Planting Honeysuckle Vines Creating A Green Wall. 2) Construction Works Related To The Construction Of A Technical Road, Technical Yard And Parking Lots, 3) Infrastructure For Providing Greenery And Green-Blue Infrastructure, Including: A) Paths, Park Squares And Alleys, Field Stairs, Sand Surface Of The Square Playground,B) Park Lighting With Power Supply To The Infrastructure,C) Video Monitoring Of The Park,D) Small Infrastructure Facilities (Benches, Waste Bins, Bicycle Racks).3. Due To The Limited Amount Of Financial Resources At This Stage, The Implementation Of The Following Elements Covered By The Design Documentation Is Waived: - Construction Of A Public Toilet With A Warehouse And A Water Supply And Sanitary Sewage Connection, - Construction Of The Inhalatorium Salt Graduation Tower, - Construction Of A Multi-Purpose Sports Field And A Tennis Court, - Installation Of Playground Equipment, - Construction Of A Mini Rope Park, - Construction Of A Skate Park, - Construction Of A Dry Dryplaza Fountain Along With Connections, - Construction Of An Outdoor Stage With A Roof And Stands, - Outdoor Cinema, - Square With Deckchairs And Hammocks, - Forest Health Path, - Educational Path For Children, - Bird Canteens, Feeders, Nesting Boxes, - Hotels For Insects. The Above Is Presented In Annex No. 7 To The Swz. 4. The Subject Of The Order Should Be Performed In Accordance With The Design Documentation, Technical Specification For The Execution And Acceptance Of Works, Developed By The Design Unit: Aramix Design Office, Ul. Grunwaldzka 3/50, 08-300 Sokołów Podlaski (Annex No. 6 To Swz), Excluding The Part Of The Project Regarding The Development Of The Square At Ul. Saint Jana Pawła Ii, Covering Plots No. 2129/5, 2119/4.
|