The Subject Of The Order Is The Reconstruction Of The Gas Boiler Room Along With Changing The Location Of The Heat Source In The Building Of Primary School No. 3 In Strzegom As Part Of The Task Entitled: Relocation Of The Boiler Room At Psp No. 3 In Strzegom. The Task Will Be Implemented On The Basis Of The Decision Of The Świdnica Staroste For A Building Permit And Design Documentation Prepared By The Company: Invent Pracowania Projektowo - Executive Mgr. Engineer Jacek Krawczyński, Ul. Spółdzielcza 11, 58-100 Świdnica. The Order Includes The Transfer Of The Boiler Room Located In The Basement Of The Building To Its Ground Floor To An Office Room Along With The Implementation Of The Necessary Installations, A Separate Entrance And The Adaptation Of The Room For The Needs Of The Boiler Room. The Subject Of The Contract Includes, Among Others: 1) Demolition, Disassembly, Brickwork, Piercing, Passage Of Fire Protection, Sanitary And Electrical Installations Along With Markings, 2) Dismantling And Reinstallation In The New Location, There Are Two Existing Gas Boilers With Accessories (With A Rated Power Of 2 X 200 Kw, Type Logano Plus Kb 372-200, Brand Buderus),3) Perform Sanitary Installation Works: Installation In The Gas Boiler Room With The Transfer To The New Location Of The Central Heating Pumping System, The Heating Pump System For The Preparation Of Domestic Hot Water, And The Domestic Hot Water Tank. Hot Water Circulation Pump And Hydraulic Coupling, Blower Filter, Water Treatment Station And Other Boiler Room Equipment. Changing The Location Of The Diaphragm Expansion Vessels, 4) Dismantling The Existing Flue Gas Duct And Gravity Ventilation And Installing A New Flue Gas Duct And Gravity Ventilation Duct, Relocating And Adapting The Existing Flue Gas Collecting Duct For The New Location Of The Boiler Room, Constructing A Supply Duct To The Boiler Room And Connecting New Outside Fresh Air Ducts To The Boilers, 5) Performing Electrical Installation Works: Powering The Devices With Electricity, Automatics For The Gas Boiler Room, Installation Lighting, Relocation Of The Boiler Room Switchgear To A New Location, Relocation Of The Gazex Type Gas Safety System To A New Location Along With The Protocol Activation Of The Gas Safety System, Construction Of An Equipotential Installation, 6) Construction Of A Flue Gas Discharge Installation, Gravity Ventilation Installation, Supply Ventilation And A Gas Safety Installation, 7) Equip The Boiler Room Rooms With A Powder Fire Extinguisher With A Mass Of Min. 6 Kg With Abc Powder, 8) Renovate The Rooms, Including Separating The Boiler Room As A Separate Fire Zone (Including Replacing Windows And Doors, Installing A Self-Leveling Screed, Anti-Moisture Insulation, Covering With Gress Floor Tiles With Minimum Dimensions Of 30X30, New Cement-Lime Plasters On Walls And Ceilings, Painting The Walls With Oil Paint At Full Height, Painting Ceilings With Latex Paint, 9) Make Technical External Steel Stairs,10) Br
|