|
Construction Work – Design And Execution Of Works Entitled: Section C - Construction Works On Railway Line No. 201, Section Gdańsk Osowa - Gdynia Główna As Part Of The Project Works On The Kościerzyna - Gdynia Section. The Subject Of The Order Is The Execution Of The Following Elements: Design And Execution Of Works Entitled: Section C - Construction Works On Railway Line No. 201, Section Gdańsk Osowa - Gdynia Główna As Part Of The Project Works On The Kościerzyna - Gdynia Section Implementation Of The Task Entitled Section C - Construction Works On Railway Line No. 201, Section Gdańsk Osowa - Gdynia Główna As Part Of The Project Works On The Kościerzyna - Gdynia Section, Will Be Carried Out In The Optimize And Build System And For Task A (Design And Build Railway Control And Telecommunications Industries); Design And Build For Tasks B And C; The Entire Subject Of The Order Includes The Execution Of Works For The Double-Track Railway Line No. 201 On The Section From Km 191+731 (191+629 Planned) To Km 205+200 And The Double-Track Railway Line No. 202 On The Section From Km 16+900 To Km 21+500, Which Includes The Reconstruction Of Railway Lines No. 201 Along With The Construction Of The Third Track (Railway Line No. 794) And No. 202 For The Track Industry (Including Subgrade And Subgrade Reinforcement), Road, Railway Traffic Control, Traction, Power, Telecommunications, Engineering, Cubature, Platform, Sanitary, Environmental Protection, Tree Felling, Demolition Of Cubature Structures, Non-Traction Lines, Hydrology, Phasing, Traffic Organization, Etc. Order Consists Of The Following Scopes Constituting The Basic Scope Of The Order And Includes The Preparation Of: 1) Design Documentation Necessary For The Proper Performance Of All Construction Works And Obtaining All Required Opinions, Arrangements, Approvals, Conditions, Decisions And Permits Necessary For The Implementation Of The Subject Of The Order, As Well As Updates Of The Opinions, Arrangements, Approvals, Conditions, Decisions And Permits Already Obtained For The Investment In Question, Making Arrangements By The Contractor With Skm Trójmiasto To The Extent Possible To Implement The Investment; 2) All Construction Works In Accordance With The Scope Of The Order On The Basis Of The Design Documentation Developed By The Contractor And Approved By The Ordering Party, Referred To In The Above-Mentioned. Point 1, And All Preparatory Works Necessary To Perform The Scope Of The Agreement And Perform All Activities Required By Law; 3) Carrying Out A Conformity Assessment Of Each Structural Subsystem Covered By The Scope Of The Contract At Each Stage (Design, Construction And Final Tests Of The Subsystem). In Addition, The Ordering Party Also Provided For Optional Orders: 1) Option Right 1: Updating The Etcs System Level L2; 2) Option Right 2: Passenger Stop With The Working Name Gdynia Źródło Marii - Implemented In The Design And Build Formula Based On The Concept Of The Gdynia Wielki Kack Station Provided By The Ordering Party; 3) Right To Option 3: Passenger Stop With The Working Name Of Gdynia Mały Kack - Implemented In The Design And Build Formula On The Basis Of The Dz Provided By The Ordering Party (In Place Of The Field Reserve); 4) Law Of Option 4: Option On Interface. The Order Includes The Design And Construction Of The Track Scope (Including Subgrade And Subfloor Reinforcements
|