Drainage Construction Works – Lov_Martin-Andersen-Nexö-Straße_Kop. Lt02 - 2300 M³ Cable Trench - 1400 M Pipeline - 30 Pcs Shafts, Leak Tests Cables + Shafts Lt03 - 6700 M³ Cable Trench - 200 M Protective Pipe - Pcs Shafts, Leak Tests Cables + Shafts Lt04 - 430 M³ Cable Trench - 530 M Install Cable Protection Pipe Lt05 - 650 M³ Cable Trench - 20 M Protective Pipe Lt06 - 150 M³ Cable Trench - 900 M Protective Pipe - 300 M Cable Laying Lt07 - Demolition 53 Street Lights With 11 Steel Masts Height 5 To 10 M And 15 Concrete Masts Height Up To 10 M - Demolition 600 M Low-Voltage Cable Cu Up To 16 Mm² And 870 M Low-Voltage Aluminum Cable 25 Mm² - Earthworks For 2500 M Cable Trench, 61 Pcs Light Pole Foundations - 6500 M Cable Protection Tubes Ad 110Mm With 38 Pcs Cable Ducts - 3500 M Cable Nyy-J 5X16 Re - 21 Pcs Light Masts, Zinc-Plated Steel Conical H 9 M Coated Db703 - 38 Pcs Light Masts, Zinc-Plated Steel Conical H 6 M Coated Db703, - 2 Pcs Light Poles, Zinc-Plated Steel Conical H 5 M Coated Db703 - 79 Pcs Galvanized Steel Brackets, Various Projections, Coated Db703 - 82 Pcs Led Mast-Mounted And Mast-Top Lights In Various Sizes / Outputs - 61 Pcs Cable Junction Boxes With Integrated Surge Protection - 1 Pc Street Lighting Control Cabinet Lt08 - 14,000 M² Take Up Asphalt Pavement - Pick Up 2900 M Of Curb - Pick Up 2000 M² Of Paving - Pick Up 1900 M² Of Paving - Loosen 20,000 M³ Of Soil - Install 13,200 M² Of Asphalt Pavement - Place 3,500 M Of Curb - Create 7,500 M² Of Gravel Base Layer - Create 6,200 M³ Of Frost Protection Layer - Set 4,500 M Of Curb - Produce 4500 M² Of Paving - 2400 M Of Paving Strips - 1200 M Of Seepage Pipe With Earthworks - 24 Pieces Of Plastic Shaft With Earthworks. Manufacture - 550 M Connection Line - 70 Pcs. Install Street Drain With Erdarb. - Lay 13,000 M² Of Geotextile As A Separating Layer - 8,800 M³ Of Soil Replacement - Create 2,800 M Of Type I Markings - Create 2,600 M Of Type Ii Markings - Attach 110 Traffic Signs - 820 M² Of Natural Stone Paving - Break Off 2,400 M Of Drainage Pipes 22,200 M³ N.Dangerous. Dispose Of Waste From Construction Site - 2000 M³ Pipe Size. M. Shaft Construction. Manufacturer
Contact Information
Address
Fischmarkt 1
Contact No.
0361 655-1286
Email
verdingungsstelle@erfurt.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105634235
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.