Tenders Are Invited For Construction Work For Pipelines, Communication And Power Lines, For Highways, Roads, ... in Finland
Tender Notice
TenderID
105633919
Tender Brief
Tenders Are Invited For Construction Work For Pipelines, Communication And Power Lines, For Highways, Roads, Airfields And Railways; Flatwork – Yllikkälä-Simolantie 110 Kv Voimajohto
Construction Work For Pipelines, Communication And Power Lines, For Highways, Roads, Airfields And Railways; Flatwork – Yllikkälä-Simolantie 110 Kv Voimajohto. In The Project, A New Yllikkälä-Simolantie 110 Kv Power Line Will Be Built For Lappeenrantan Energiaverkot Oy (Hereafter The Client) In Accordance With The Documentation Attached To The Tender Request. The Power Line Will Be Built Next To Fingrid Oyjs Existing Power Line On The Same Power Line. The Length Of The Power Line To Be Built Is Approximately 8.12 Km, And Its Starting Point Is The Yllikkälä Substation In Fingirid And The End Point Is The Simolantie Substation Of Lappeenrantas Energiaverkkök. The Current Main Road Will Be Slightly Expanded And The Customer Is Responsible For The Permit Related To The Widening Of The Main Road. The Construction Contract Includes Approximately 7.71 Km Of Overhead Cable Network, Approximately 0.41 Km Of Underground Cable Network And Some Modification Work At The Simolantie Substation. The Structures Of The Overhead Network Are Mainly T-Poles Of Two Current Circuits. In The Transmission Line To Be Built, The Conductors Will Be Installed In The Current Circuit On The Side Of Fingrids Existing Transmission Line. The Construction Contract Includes The Construction Of An Approximately 0.41 Km Long 110 Kv Underground Cable Section. All Materials Needed For Construction Are Included In The Construction Contract, And The Supplier Is Responsible For Purchasing The Materials. The Project Includes Two Options, Which The Customer Decides To Use Separately: - Option 1: Installation Work Of The Second Circuit To The Power Line, - Option 2: Purchase Of Protective Equipment For The Simolantie Substation. In Addition, Unit Prices For Possible Additions And Changes Are Tendered In The Procurement. The Planned Preliminary Execution Period Of The Construction Contract Is 1 April 2026 - 30 November 2027. The Customer Reserves The Right To Revise The Implementation Schedule For Reasons Beyond The Control Of The Customer And The Supplier, E.G. Delays In Permits Or The Availability Of Materials. The Binding Construction Contract Implementation Period Is Confirmed Before The Contract Is Signed.
Contact Information
Address
Puutarhakatu 6
Contact No.
+358 444188824
Email
ari.sormunen@sansia.fi
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105633919
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.