Flood Prevention Works – Flood Protection Work, Construction Phases 1 - 3. Construction Phase 1: Technical Flood Protection Measures Dike Tiefenbach; Strengthening An Existing Dike Section By Raising The Dike And Installing An Internal Seal. Dike Filling Work With Installation Of An Internal Seal. Construction Phase 2: Installation Of A Corrugated Steel Culvert As A Crossing Under The State Road St2058; Installation Of A Corrugated Steel Culvert As A Crossing Under The State Road St2058 In Order To Prevent The Water Level South Of The St2058 From Rising In The Event Of Flooding. Carrying Out Asphalt Demolition, Soil Excavation And Sector Security Work Including Transport And Disposal Services. Professional Installation Of A Corrugated Steel Culvert. Backfilling Of The Excavation Pit And Restoration Of The Original Road Surface. Construction Phase 3: Technical Flood Protection Measures Along The Munich-Garmisch Railway Line; Installation Of A Flood Protection Line As A Sheet Pile Wall Construction Along The Munich-Garmisch Railway Line. Facing The Sheet Pile Wall Construction Using Pre-Placed, Filled Gabion Grids.
Contact Information
Contact No.
+49881182191
Email
vergabekoordination@wwa-wm.bayern.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105633685
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.