|
Tender For Running Deposit Works For Annual Deposit Work- 1 Loading, Carriage and unloading of ST poles including old & used S.T. Pole from store to work site or vice-versa. 2 Loading, Carriage and unloading of ACSR Dog/ Panther Conductor from store to work site or vice-versa. 3 Loading, Carriage and unloading of PCC poles with from store to work site or vice-versa. 4 Loading, Carriage and unloading of Earth wire/G.I. wire from store to work site or vice-versa. 5 Loading, Carriage, unloading and taking out cable from cable drum of LT/HT (3*70 sqmm to 3*400 sqmm ) cable from store to work site or vice-versa. 6 Loading, carriage and unloading of Aearial Bunched Cable all size from store to work site or vice-versa. 7 Loading,Carriage and unloading of H.T. metering cubical from store to site or vice-versa 8 Loading,Carriage and unloading of H.T. O/D type metering unit all range from store to site or vice-versa 9 Loading,Carriage and unloading of distribution transformer upto 630 KVA from store to site or vice-versa 10 Loading, Carriage and unloading of GI/MS/HDPE pipe from store to work site or vice-versa. 11 Loading, Carriage and unloading of LT single core (1*70 sqmm to 1*400 sqmm ) cable from store to work site or vice-versa. 12 Loading, Carriage and unloading of LT/HT cable jointing box from store to work site 13 Loading, Carriage and unloading of 11 KV VCB/ 33 KV VCB/ CRP / RMU / SECTIONIZER from Kesco store work site or vice-versa. 14 Loading, Carriage and unloading of 3/5/10 MVA T/F (including old & used) from store to work site or vice versa 15 Loading, Carriage and Unloading of 33 KV C.T/P.T. from store to site and vice versa 16 Erection of Single/Stud Pcc Pole including fitting of all material. 17 Erection of Double pole structure of Pcc as per standard specifications including fitting of all material. 18 Erection of Single/Stud STP Pole including fitting of all material. 19 Erection of STP Double pole structure as per standard specifications including fitting of all material. 20 Erection of Double pole structure where existing Single Pole including fitting of M.S. Channel and other accessories etc. 21 Grouting of pole with cement brick ballast and coarse sand as per standard specification including cost of all material. 22 Making of pole plinth of 400 mm dia, 400 mm height with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. 23 Fixing of danger board on erected poles 24 Fabrication/modifications of M.S. Structure/Items with M.S. Angle and M.S. Flat. as per requirement of site conditions. 25 Painting of all M.S. item fitted on single pole such as channel,angle, brackets including cost of all material. 26 Painting of all M.S. item fitted on double pole structure such as channel,angle, cross bracing including cost of all material. 27 Painting of Steel Tubular Pole with one coat of red oxide and two coats of first enamel Alm. Paint upto fuse set including cost of all materials. 28 Dismentalling of ST/PCC Pole including all fitting such as V-Type X-arm/M.S Channel/ Guarding Angle/LT Bracket, insulators etc. 29 Earthing connection of newly erected MS structure/Equipment with GI Strip by welding as per standard specifications. 30 Earthing of poles as per standard specifications. 31 Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc. 32 Laying, stringing, tensioning & final sagging of 3 Phase 3 Wire/4 Wire HT/LT O/H ACSR conductor line. 33 Laying, stringing, tensioning & final sagging of Earth wire/G.I. wire including of cross lacing in every 2.5 mtr. 34 Dismentalling of binding wire from insulators and loosening of the ACSR mixed conductor on each pole then lowering down the ACSR mixed conductor & rolling into bundles. 35 Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work. 36 Opening of L.T. Jumpers from the existing 3 Phase 4 Wire L.T. O.H. line for erection work. 37 Making of H.T. Jumpers of 3 Phase 3 Wire H.T. O.H. line after erection of work. 38 Making of L.T. Jumpers of 3 Phase 4 Wire L.T. O.H. line after erection work. 39 Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection. 40 Making of L.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection. 41 Making of L.T. Shackle point by brackets, clamps, G.I. Shakle strips and insulators, tightening of line, binding of conductors and proper connections. 42 Digging of Trench for laying of LT/HT (3*70 sqmm to 3*400 sqmm ) cable in normal soil in size of 30 cm. wide and 0.5 to 1.5 meter deep. 43 Digging of Trench for laying of LT/HT (3*70 sqmm to 3*400 sqmm ) cable in kharanja soil in size of 30 cm. wide and 0.5 to 1.5 meter deep. 44 Digging of Trench for laying of LT/HT (3*70 sqmm to 3*400 sqmm ) cable in metallic road in size of 30 cm. wide and 0.5 to 1.5 meter deep. 45 Digging of Pit 2x2x1 mtr. for laying of cable through HDD Method. 46 Laying of LT/HT (3*70 sqmm to 3*400 sqmm ) XLPE Cable in digged trench covering with bricks and back filling and proper ramming. 47 Restoration of Metallic/RCC/Interlocking road proper repairing with appropriate materials after completion of work as per requirement of site. (where restoration charges not paid by kesco) 48 Laying of LT/HT (3*70 sqmm to 3*400 sqmm ) XLPE Cable through GI/MS/HDPE pipe in digged trench. 49 Laying of LT/HT (3*70 sqmm to 3*400 sqmm ) XLPE through HDD Method With GI/MS/HDPE Pipe 50 Laying of LT/HT (3*70 sqmm to 3*400 sqmm ) XLPE through HDD Method Without Pipe 51 Laying of LT/HT (3*70 sqmm to 3*400 sqmm ) XLPE Cable Over head (Pole to Pole etc.) with Fixing of Holding Clamp on existing /newly erected ST Pole 52 Making indoor/outdoor joints of LT/HT (3*70 sqmm to 3*400 sqmm ) XLPE Cable where the cable is being laid. 53 Making straight through joint of LT/HT (3*70 sqmm to 3*400 sqmm ) XLPE Cable where the cable is being laid. 54 Mounting of LT/HT (3*70 sqmm to 3*400 sqmm ) XLPE Cable on pole.. 55 Mounting of LT/HT (3*70 sqmm to 3*400 sqmm ) XLPE Cable through GI/MS/HDPE pipe 56 Laying of LT Aerial Bunched Cable all size including fixing suspension clamp with eye hook , Dead end clamp with Eye hook on erected Steel Tubular Pole etc. 57 Mounting & Erection of single phase distribution box of AB Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc. 58 Mounting & Erection of three phase distribution box of AB Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc. 59 Opening and reconnection of consumer service connections after replacement of line/ poles etc. 60 Dismentalling of LT/HT (3*70 sqmm to 3*400 sqmm) cable on each pole then lowering down the cable & rolling into bundles. 61 Shifting and Erection of DT/RMU/SECTIONIZER/CTPT UNIT from existing plinth/double pole structure to newly constructed plinth/DP structure with the help of crane within 50 mtr range. 62 Erection of DT all capacity upto 630KVA on plinth/double pole structure with the hep of crane as per standard norms. 63 Connection of H.T. Jumper from fuse set to H.T. Bushing of the transformer. 64 Fitting of L.T. D.B./LT CKT by brackets & clamps on double pole structure & L.T. Cable Connection from T/F to L.T.D.B./LT CKT. 65 Connection of L.T. cable from L.T.D.B/LT CKT/DT. to Supply point 66 Laying and Stringing of Single Core (1*70 sqmm to 1*400 sqmm) L.T. Cable 67 Laying and Stringing of 3 ½ Core (35 sqmm to 400 sqmm) L.T. Cable. 68 Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia B-Class 40 feet long with socket cutter and connection of pipe to O/D unit and metering cubical Body with 25*3 mmsq GI strip and also making earthing pit all material shall be provided by contractor with cost of all material. 69 Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia B-Class 60 feet long with socket cutter and connection of pipe to distribution T/F Neutral/Body or any other point with 50*5 mmsq GI strip and also making earthing point all material shall be provided by contractor with cost of all material. 70 Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia B-Class 80 feet long with socket cutter and connection of pipe to T/F Neutral/Body or any other point with 50*5 mmsq GI strip and also making earthing pit all material shall be provided by contractor with cost of all material. 71 Fabrication, erection & grouting(400mm*400mm) of T/F fencing of frame size 3x2.4 mtr. including cost of M.S. Angle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting fo two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil and dust. 72 Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.2 x 1.2 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 15 mm thick done on all the exposed sides to the plinth with fixing of 2 no. MS Channel for transformer base.(all material provided by contractor) 73 Fixing of T.P.M.O on D/P structure. 74 Making and Fixing of D.O. fuse set/ H.T. fuse on D/P structure. 75 Construction of plinth for H.T. pilffer metering cubical/Sectionizer/RMU 76 Erection of O/D type metering unit on D/P structure 77 All electrical Connection of O/D unit and Metering cubical as per standard norms. 78 Erection of H.T. metering cubical on plinth as per standard norms. 79 Dismentalling of earthing strip from existing 11 KV VCB/ 33 KV VCB/ CRP / RMU / SECTIONIZER. 80 Chopping of tree branches coming in the route of HT/LT line which are touching the phase line conductors to avoid fault on feeder, for 75mm dia to 450mm dia as per requirement of site.(Rate per tree) 81 Connecting of newly erected network with Kesco mains including testing, commissioning and energization of the same completely. 82 Making Plinth for erection of 33 KV V.C.B. structure including cost of Civil Material 83 Laying of control cable including all related civil work 84 Shifting of 11 KV VCB/ 33 KV VCB/ CRP / RMU / SECTIONIZER from unloading point to meter room/Control room/any site. 85 Erection of 11 KV VCB/ 33 KV VCB/ CRP / RMU / SECTIONIZER on meter room/control room/constructed plinth as per standard norms. 86 Wiring, Testing and commissioning of newly erected 11 KV VCB/ 33 KV VCB/ CRP / RMU / SECTIONIZER and all related work. 87 Connecting of 11 KV Cable on newly erected 11 KV VCB / RMU / SECTIONIZER after erection work. 88 Connection of earth strip from earthing point to 11 KV VCB/ 33 KV VCB/ CRP / RMU / SECTIONIZER Panels. 89 Shiffting of 3/5/10 MVA, 33/11 KV T/F Unloading point to plinth with 2 No crane 90 Erection of 3/5/10 MVA 33/11kv T/F radiators, conservator tank vent pipe and all other accessories on main tank of following T/F including oil filling and all related work. With 2 No. crane 91 Earthing of T/F at two points by extending the existing M.S. Flat with main earthmate by welding. 92 Disconnecting of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection. 93 Connecting of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection. 94 Construction of power T/F plinth suitable for 5/10 MVA 33 KV T/F in size of 3 x 3 x 1.5 Mtr. Digging of pit in size of 3.5 x 3.5 x 1.2 Mtr. Of CC work at bottom in size of 3.5 x 3.5 x .15 Mtr. With ratio of 1:4:8 its proper ramming and curing thereafter brick work in size of 3 x 3 x 0.8 Mtr. with 1 : 6 CC Sand ratio, thereafter CC work on top in size of 3 x 3 x .25 Mtr. thereafter plastering all around the open portion, grouting of rail and M.S. Angle in top CC work and its proper curing. all material provinding by contractor 95 Fitting of 3 mtr. Long 2 No. rail pole on power T/F plinth during erection of power transformer. 96 T/F Flexible copper bond 30mm vide 30 Cm long & connecting with neutral support to T/F neutral bushing & proper tightening. 97 Leveling of Newly constucted sub station Switch Yard 98 Filling of soil in newly constructed S/S Yard 99 Erection of O/D 33 KV CT/PT with the help of crane 100 Erection of CT/PT Junction Box 101 Erection and grouting of Busbar Gantry 102 Fabrication of Busbar Gantry 103 Erection charge of lower bus bar with ACSR Panther conductor 104 Erection charge of upper bus bar with ACSR Panther conductor 105 Erection and grouting of various MS Structure with proper welding , 1 : 4 : 8 CC ratio in proper alignment and plinth 15 Cm. above ground level and smooth finish. 106 Painting of M.S. Structure including cost of all material. 107 Making of Earthmat for new sub station (M.S strip provided by contractore) 108 Mounting of 11KV Pin/33KV Pin / 11KV Disk Insulator 109 Erection of 33KV Line Isolator / Bus Isolator on erected structure 110 Erection of LA on erected structure 111 Arrangement of requirment of material for wiring and testing of panels & Power T/Fs of newly constucted sub station 112 Loading,Carriage and unloading of other material not covered above from store to site or vice-versa for all works under agreement. Please Enable Macros to View BoQ information
|