|
Tender For Maintenance And Repair / Painting To Steel Furniture Of Navy Area And Cg Area Under Ge Haddo, Sri Vijaya Puram; 2 Almirah med steel with shelves :-FD-1032 3 Three Way locking system as per drg. 4 Lock as per existing pattern and shape. Make- Harrison,Godrej,Link 5 CP Handle as approved by BSO/GE irrespective of what is shown on drg. 6 Leg as per drg. 7 Repairs to dented door by removing the door from hinges, making smooth and straight by denting applying putty and refixing by replacing unserviceable hinges complete all as specified and as directed. 8 Repairs to existing shelf by opening the clips/rivets of shelf, making smooth and straight by denting applying putty and refixing by replacing unserviceable clips/rivets complete all as specified and as directed. 9 Supply & Fixing of new shelf by opening the clips/rivets and refixing by replacing unserviceable clips/rivets complete all as specified and as directed. 10 Supply & Fixing new door by removing the door from hinges, and refixing by replacing unserviceable hinges complete all as specified and as directed. 11 Painting of Almirah med steel with shelves as per Note. 12 Almirah large steel with shelves :- FD-1031 13 Three Way locking system for almirah large as per drg. 14 Lock as per existing pattern and shape. Make : Harrison,Godrej,Link 15 CP Handle as approved by BSO/GE irrespective of what is shown on drg. 16 Leg as per drg. 17 Repairs to dented door by removing the door from hinges, making smooth and straight by denting applying putty and refixing by replacing unserviceable hinges complete all as specified and as directed. 18 Repairs to existing shelf by opening the clips/rivets of shelf,making smooth and straight by denting applying putty and refixing by replacing unserviceable clips/rivets complete all as specified and as directed. 19 Supply & Fixing new shelf by opening the clips/rivets and refixing by replacing unserviceable clips/rivets complete all as specified and as directed. 20 Supply & Fixing new door by removing the door from hinges, and refixing by replacing unserviceable hinges complete all as specified and as directed. 21 Painting of Almirah large steel as per Note. 22 Almirah large steel HH HS:- FD-1033 23 Three Way locking system for almirah large Steel HH HS as per drg. 24 Lock as per existing pattern and shape. Make-Harrison,Godrej,Link 25 CP Handle as approved by BSO/GE irrespective of what is shown on drg. 26 Leg as per drg. 27 Repairs to dented door by removing the door from hinges, making smooth and straight by denting applying putty and refixing by replacing unserviceable hinges complete all as specified and as directed. 28 Repairs to existing shelf by opening the clips/rivets of shelf,making smooth and straight by denting applying putty and refixing by replacing unserviceable clips/rivets complete all as specified and as directed. 29 Supply & Fixing new shelf by opening the clips/rivets and refixing by replacing unserviceable clips/rivets complete all as specified and as directed. 30 Supply & Fixing new door by removing the door from hinges, and refixing by replacing unserviceable hinges complete all as specified and as directed. 31 Supply and fixing of 20 mm dia Chromium plated steel conduit pipe hanger rod complete all as specified and as directed. 32 Repairs to dented drawer by removing the drawer, Making smooth and straight by denting applying putty complete all as specified and as directed. 33 Painting of Almirah large steel HH HS as per Note. 34 Bed hard :- FD/E6/MAP/08® 35 Taking out existing broken plywood from the bed hard by loosening the nut bolts with washers.S&F of new 12 mm thick BWR grade plywood fixed to bed hardframe with new GI Nut, bolts. Make of plywood - Greenply/Century Ply/Archidply. 36 Taking out existing broken head board form bed hard and fixing new head board with 18 mm thick exterior grade pre laminated particleboard both side laminated in light walnut shade or shade as approved by BSO/GE with 4mm thick teak wood beading in matching shade with new screws complete all as specified and as directed. 37 Taking out existing broken foot board form bed hard and fixing new foot board with 18 mm thick exterior grade pre laminated particleboard both side laminated in light walnut shade or shade as approved by BSO/GE with 4mm thick teak wood beading in matching shade with new screws complete all as specified and as directed. 38 Hard rubber shoes as per drg. 39 Painting of Bed hard as per Note. 40 Chair writing :- FD/E6/MAP/12 41 S&F new seat made of 12mm thick BWR grade plywood over which 50 mm thick 32 density foam cushion shall be fixed with pvc lipping all round.The foam and plywood shall also be covered with best qualityfabric as approved by BSO/GE irrespective of what is shown on drg complete all as specified and as directed. 42 S&F new back made of 12mm thick BWR grade plywood over which 50 mm thick 32 density foam cushion shall be fixed with pvc lipping all round.The foam and plywood shall also be covered with best quality fabric as approved by BSO/GE irrespective of what is shown on drg complete all as specified and as directed. 43 Replacement ofnew arms with polyurethane reinforced with MS insert arms as shown on drgs /existing in chair complete all as specified and as directed. 44 Rubber stoper as per drawing 45 Painting of Chair writing as per Note. 46 Chair Computer : FD/E6/MAP/01 47 Replacement of pedestal assembly of chairs computer same as shown on drgs /existing in chair complete all as specified and as directed. 48 Replacement of hydraulic hieght adjustment base assembly of chairs computer same as shown on drgs /existing in chair complete all as specified and as directed. 49 Replacement ofnew arms with polyurethane reinforced with MS insert arms as shown on drgs /existing in chair complete all as specified and as directed. 50 Removing the old torn/damaged tapestry cloth/rexine from the seat of the chair and providing the same with tapestry/rexine over a layer of foam(75mm thick,40 density) as shown on drgs /existing in chair. Colour & shade of cloth/Rexine as approved by BSO/GE. 51 Removing the old torn/damaged tapestry cloth/rexine from the back of the chair and providing the same with tapestry/rexine over a layer of foam(75mm thick,40 density) as shown on drgs /existing in chair. Colour & shade of cloth/Rexine as approved by BSO/GE. 52 Chair verandah:- FD-259/359/FD/MAP-II/06 53 Arc welding to broken parts/joints of chairs. 54 Removing the existing unserviceable cane plastic from the chair and Recanning the chair with plastic cane 4 to 6 mm wide, white colour and Cream colour, (MAT Pattern),quality as approved by GE/Engr-in-Charge.. 55 Removing the existing unserviceable PVC seat and back from the chair. S&F PVC seat and back 4mm thick to the chair after providing one extra support in between seat and back of chair.The support shall be of 19mm dia MS tube duly welded horizontally seat and back as directed by BSO. The PVC seat shall be got approved from BSO/GE before supply. 56 S&F best quality new PVC shoes to the legs of chair. 57 Painting of chair Verandah as per Note. 58 Chair CB steel with arms FD-75(M)/386 59 Supply & fixing of new seat and back as per drawing,Caning of seat and back shall be in godrej pattern complete all as specified and as directed. 60 Repair & Replacement of Arm rest shall be made of teak wood & size as per drg. 61 Repair to stiffner under seat and back as per drg. 62 Rubber stoper as per drg. 63 Painting of Chair CB steel with arms. 64 Charpoy GI Pipe:- FD-220 65 Taking out old broken end long rail from three way elbow by unscrewing and replacing with new long rails of GI pipe 32mm Med grade duly threaded both end to the required size fitted to the frame complete all as specified and directed by Engineer -in- charge. Make of Pipe : JINDAL/TATA/ZENITH/PRAKASH/SWASTIK 66 Taking out oldbroken end short rail from three way elbow by unscrewing and replacing with short rail of GI pipe made out of long rail retrieved wide Item serial No-9.01 here-in-before duly thread both ends to require size fitted to the frame complete all as specified and directed by Engineer -in- charge. 67 Taking out old broken end short rail from three way elbow by unscrewing and replacing with new short rails of GI pipe 32mm Med grade duly threaded both end to the required size fitted to the frame complete all as specified and directed by Engineer -in- charge. Make of Pipe : JINDAL/TATA/ZENITH/PRAKASH/SWASTIK 68 Taking out old broken end leg from three way elbow by unscrewing and replacing with legs of GI pipe made out of short rail retrieved vide Item serial No-9.02, 9.03 here-in-before; duly threaded at one end to required size fitted to the frame complete all as specified and directed by Engineer -in- charge. 69 Taking out old unserviceable/broken three way elbow from GI pipe by unscrewing and replacing with new three way elbow GI 32 mm dia ISI marked and complete all as specified and directed by Engineer -in- charge.Make of Elbow : Unik/NVR/MIC. 70 Taking out old unserviceable/broken GI check nut from the frame by unscrewing and replacing with new check nut GI 32 mm dia as per sample kept in GE office and complete all as specified and directed by Engineer -in- charge. Make of check nut :Unik/NVR/MIC. 71 Taking out existing broken plywood from the Charpoy GI pipe by loosening the nut bolts with washers.S&F of new 12 mm thick BWR grade plywood of size 1980x900x12mm fixed to Charpoy GI Pipe frame with new Nut, bolts and washer. Make of plywood - Greenply/Century Ply/Archidply. 72 Replacement ofMS flat iron of size (50x5 mm) on long rail parallel to short rail. 73 Charpoy with hard top : FD/MAP-II/01 74 Taking out existing broken plywood from the charpoy by loosening the nut bolts with washers.S&F of new 12 mm thick BWR grade plywood fixed to charpoyframe with new GI Nut, bolts. Make of plywood - Greenply/Century Ply/Archidply. 75 Replacement of stiffners as per drg. 76 Hard rubber shoes as per drg. 77 Painting of Charpoy as per Note. 78 Locker bed side steel:- FD-1029 79 S& F new 3mm thick Stainless steel hasp & staples including removal of UNSV hasp & staples. 80 Repairs to dented door by removing the door from hinges, making smooth and straight by denting applying putty and refixing by replacing unserviceable hinges. 81 Replacemet of Leg as per drg. 82 Painting of Locker steel as per Note. 83 Shoe rack steel :- FD/E6/MAP/02 ( R) 84 Repairs to existing frame of shoe rack with welding, Grinding and smoothening of surface by applying putty complete all as specified and as directed. 85 Supply and fixing of mesh made with 3 mm dia MS rod at Equidistant with all around 20 mm dia MS pipe welding to legsas per drawing complete all as specified and as directed. 86 Hard rubber shoes as per drg. 87 Painting of shoe rack as per Note. 88 Teapoy Verandah :- FD-383/255 89 Top as per above Note & drg. 90 Short rail as per drg. 91 Long rail as per drg. 92 Leg as per drg. 93 Painting of Teapoy Verandah as per Note. 94 Chair school with hand board :- FD/E6/MAP/05 95 Replacement of PVC seat and back 96 S & F of mesh as per drg. 97 hand board as per drg. 98 PVC rubber shoe. 99 Painting of Chair school as per Note. 100 Table bed side steel :FD/E6/MAP/15( R) 101 Supply & fixing of newtop of 18 mm thick exterior grade prelaminated particle board of existing shade/both side laminated with light Wallnut shade or as approved by BSO/GE covered with 4 mm teak wood beading in matching shade, Supply & fixing new handle for cupboard. All steel surface shall be painted with two coats of synthetic enamel paint of existing shade after preparition of surface. 102 Sides left/Rright as per drg 103 Upper Drawer as per drg 104 Lower drawer as per drg 105 Front legs as per drg 106 Rear Legs as per drg 107 Back as per drg 108 Replace old UNSV/rusted telescopic channel for smooth functioning. 109 Hard rubber shoes as per drg. 110 Teapoy Varandah : FD/E6/MAP/17 111 Top as per drg. 112 Rubber Shoes as per drg. 113 S & F of mesh as per drg. 114 Painting of Teapoy Verandah as per Note. 115 Table computer FD/E6/MAP/03 116 Top as per drg. 117 Legs board (rigt/left) as per drg. 118 keyboard tray with channel as per drg 119 Self (Top, Verticle, Bottom) as per drg 120 Drawer with channel as per drg. 121 Nylon buffers as per drg. 122 Painting of Table dining as per Note. 123 Table office clerk steel :FD-1004/1005 124 Top as per drg. 125 Legs as per drg. 126 Lock as per existing pattern and shape. Make-Harrison,Godrej,Link 127 Long Rail/Stiffner as per drg. 128 Short Rail/Stiffner as per drg. 129 Drawer as per drg. 130 Rubber shoes as per drg. 131 Painting of Table dining as per Note. 132 Table office officer steel :FD-1002/1003 133 Top as per drg. 134 Legs as per drg. 135 Lock as per existing pattern and shape. Make-Harrison,Godrej,Link 136 Long Rail/Stiffner as per drg. 137 Short Rail/Stiffner as per drg. 138 Drawer as per drg. 139 Rubber shoes as per drg. 140 Painting of Table dining as per Note. 141 Table 900 x 600 steel with drawer :FD-1008 142 Top as per drg. 143 Legs as per drg. 144 Lock as per existing pattern and shape. Make-Harrison,Godrej,Link 145 Long Rail/Stiffner as per drg. 146 Short Rail/Stiffner as per drg. 147 Drawer as per drg. 148 Rubber shoes as per drg. 149 Painting of Table dining as per Note. 150 Chair CB steel without arms FD-75(M) 151 Supply & fixing of new seat and back as per drawing,Caning of seat and back shall be in godrej pattern. 152 Repair to stiffner under seat and back as per drg. 153 Rubber stopper as per drg. 154 Painting of Chair CB steel with out arms. 155 Book Case open large : FD-1028 156 Handle as approved by BSO/GE irrespective of what is shown on drg. 157 Lock as per existing pattern and shape. Make-Harrison,Godrej,Link 158 Replacemet of glass as per drg. 159 Painting of Book case open large as per Note. 160 Charpoy Double bunk Cot Steel with plywood top : CWE/TD/FD/03/16 161 Taking out existing broken plywood from the charpoy Double bunk by loosening the nut bolts with washers.S&F of new 12 mm thick BWR grade plywood fixed to charpoyframe with new GI Nut, bolts. Make of plywood - Greenply/Century Ply/Archidply. 162 Replacement of stiffners as per drg. 163 Hard rubber shoes as per drg. 164 Painting of Charpoy Double bunk as per Note. 165 Charpoy Folding IP with haed top : FD-388 166 Taking out existing broken plywood from the charpoy Folding by loosening the nut bolts with washers.S&F of new 12 mm thick BWR grade plywood fixed to charpoyframe with new GI Nut, bolts. Make of plywood - Greenply/Century Ply/Archidply. 167 Hard rubber shoes as per drg. 168 Painting of Charpoy Folding as per Note. 169 Rack adjustable 6 tier steel : FD-106/1038 170 Repairs to existing shelf by opening the clips/rivets of shelf, making smooth and straight by denting applying putty and refixing by replacing unserviceable clips/rivets. 171 Supply & Fixing new shelf by opening the clips/rivets and refixing by replacing unserviceable clips/rivets. 172 Painting of Rack adjestable as per Note.
|