|
1. The Subject Of The Order Is The Execution Of Construction Works Including The Construction Of A Rainwater Drainage System In Ul. Kochanowskiego, Reja, Gombrowicza And Gałczyńskiego, Towards The Roundabout Located At Chryzostoma Paska Street In Suchy Dwór, Commune. Kosakowo, In Accordance With The Provisions Of The Documentation Prepared By Drogado Sp. Z O.O.2. The Subject Of The Order Includes The Construction Of A Storm Sewage System, Including Street Inlets, Connecting The Existing Sewers To The Designed System And Discharging Rainwater To The Existing Sewage Well In Ul. Mikołaj Rej. Additionally, It Is Planned To Liquidate The Existing Storm Sewage System. 3. Material Scope Of The Planned Project: 1) Storm Sewage Network - Approx. 400 M, 2) Inspection Wells With Settling Tank - 11 Pcs., 3) Inlet Wells - 8 Pcs., 4) Storm Sewerage Channels - Approx. 49 M (8 Pcs.), 5) Liquidation Of The Existing Storm Sewage System - Approx. 70 M, 6) Liquidation Of Existing Inlets - Approx. 1 Pc. 4. The Contractors Scope Includes Cutting Down The Trees Indicated In The Project And Planting Them - In Accordance With The Decision On Cutting Down And Planned Plantings. 5. As Part Of This Subject Of The Order, The Contractor Will Be Obliged To Develop A Temporary Traffic Organization, Taking Into Account The Following Guidelines: A) Construction Works Should Be Carried Out In A Way That Allows For Continuous Pedestrian And Car Traffic, B) All Platforms And Working Passages Constructed To Maintain The Road And Pedestrian Crossing Should Be Assembled Only From Elements With Current Certificates And Approvals, C) The Temporary Traffic Organization Is Subject To The Opinion Of The Supervision Inspector And The Investment Department And The Roads And Greenery Management Board Of The University Of Gdańsk. Kosakowo.6. The Detailed Scope Of The Contractors Responsibilities And The Employers Requirements Are Included In The Description Of The Subject Of The Order Constituting Annex No. 7 To The Swz And The Design Documentation. 7. Moreover, When Executing The Order, All Conditions Contained In Decisions, Opinions, Arrangements, Etc. Contained In The Tender Documentation And Design Documentation Must Be Observed.8. The Contractor Will Confirm In The Form Of A Declaration In The Offer That He Has Read The Documents Mentioned, I.E. The Description Of The Subject Of The Order Together With The Attachments (Land Development Design, Architectural And Construction Design, Technical Design, Sstwior, Bills Of Quantities Included In Support, Obtained Opinions, Arrangements, Decisions, Geotechnical Opinion).9. If The Ordering Party Used Names, Trademarks, Patents Or Origin, Source Or Specific Process In The Description Of The Subject Of The Order That Characterizes The Products Or Services Provided By A Specific Contractor, They Should Be Understood As Exemplary Minimum Parameters Expected By The Ordering Party. The Ordering Party Allows The Use Of Equivalent Solutions Approved For U
|