|
Mini Dio Para 8Fo Complete Singlemode, 8 Fiber Singlemode Optical Fiber Cable, Pole Accessories With Clamp, Pressbow Frame And Preformed Handle, Optical Distribution Box, Double Singlemode Optical Patch Cord Sc/Lc, 28/11/2025 - 10:21:36, 28/11/2025 - 10:21:39, 28/11/2025 - 10:21:40, Optical Patch Cord Single Mode Dual Sc/Sc, Identification Plate For Optical Cable, Patch Cord 4P Rj45/Rj45 1, 5M Cat.6, Patch Cord 4P Rj45/Rj45 2, Patch Panel 24P Rj45 Cat.6, Surface Box For 02 Positions - Cat6, 4X4 Wall Mirrors, 4X2 Wall Mirrors, 4X2 Wall Blank Cover, 08U Rack, 1U 19 Horizontal Cable Organizer, Velcro Strap, Vinyl Labels For Indoor/Outdoor Use, Set For Fixing To Racks, Pre-Zinc Conduit. Medium 1” Galvanized, Pre-Zinc Curve. Medium 90 Of 1, Multiple Aluminum Condulet 20X20cm, Conical Unit Of 1, Electroduct Bushing Of 1, Electroduct Washer Of 1, Hexagon Screw S8, Nylon Bushing S8, Lentil Head Screw 1/4, Nut 1/4, Washer 1/4, Lentil Head Screw 3/8, Nut 3/8, Plain Washer 3/8, Full Thread Rebar 3/8 16A, Single Phase Circuit Breaker Type Ii 25A, Flexible Cable 4Mm² Blue, Flexible Cable 4Mm² Green, Flexible Cable 4Mm² Black, Flexible Cable 2.5Mm² Blue, 5Mm² Green, 5Mm² Black, Pp Cable 3X2, 5Mm, Bare Copper Cable 16Mm For Grounding, Type Iii Needle Terminal 4Mm– Flexible Cable, Type Iv Needle Terminal 2, 5Mm– Flexible Cable, Type Iii Eye Terminal Optical, Maintenance Services For The Internal Wired Network, Service For The Creation Of New Internal Network Points (Unit), Services For The Creation Of New Electrical Points (Unit), Technical Inspection By 1 Technician Or Engineer Responsible For The Survey And Subsequent Execution Of The Optical Network Project (3 Hours Per Location)., Passage Of Optical Cable Per Meter Without Supplying Materials., Fiber Fusion And Identification. Optical. Without Supplying Materials, Optical Fiber Certification With Otdr With Report Provision. Without Supplying Materials., Installation And Configuration Of Optical Distribution Box, Installation Of Optical Fiber Identifier, Installation And Configuration Of Optical Splice Box, Installation And Configuration Of Optical Splitter, Technical Inspection By 1 Technician Or Engineer Responsible For Survey And Subsequent Execution Of Internal Network Project (3 Hours Per Location)., Materials Sizing Project For A Location From 25 Points (Internal Network), Identification, Reorganization, Connectorization And Certification Of Utp Points 04 Pairs Cat.5E, Cat.6., Installation And Fixation Of 08Us Rack. Supply Of Materials, Technical Inspection By 1 Technician Or Responsible Engineer
|