|
Construction Of Cooper Track At Academia Da Cidades - Local Administration Of The Work - Local Administration, Installation Of The Work - Supply And Installation Of Site Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Rental Of Paving Services, Preliminary Services - Mechanized Land Cleaning With Backhoe (Undergrowth) Without Loading And Unloading, Mechanized Trench Excavation With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Excavator (0.8 M3), Width. From 1.5 M To 2.5 M, On 1St Category Soil, In Locations With A High Level Of Interference. Af_09/2024, 11/25/2025 - 08:28:13, Preparation Of The Bottom Of A Trench With A Width Greater Than Or Equal To 1.5 M And Less Than 2.5 M (Natural Soil Adjustment). Af_08/2020, Infrastructure - Guide Laying (Curb) In Straight Section, Made Of Prefabricated Concrete, Dimensions 80X08x08x25 Cm (Length X Lower Base X Upper Base X Height). Af_01/2024, Slim Concrete Ballast, Applied To Floors, Slabs On Ground Or Radiators, 5 Cm Thick. Af_01/2024, Execution Of Cooper Track With Application Of Asphalt Concrete (Cbuq - Acquisition At Plant) And Connection Painting (Sinapi104387), Transport With 18 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Additional For Dmt Exceeding 30 Km (Unit: M3xkm). Af_07/2020, Painting - Painting The Curb With White Lime-Based Paint (Whitewash). Af_05/2021, Floor Painting With Epoxy Paint, Manual Application, 2 Coats, Including Epoxy Primer. Af_05/2021, Miscellaneous Services - General Cleaning, Construction Of The City Academys Bathroom Block - Local Administration Of The Work - Local Administration, Installation Of The Work - Conventional Lease Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024, Mechanized Excavation For Crowning Block Or Footing With Backhoe Loader (Including Excavation For Placing Formwork). Af_01/2024, Execution And Compaction Of Landfill Body (95% Of Normal Proctor Energy) With Predominantly Clay Soil, In Layers 20 Cm Thick - Exclusive Of Excavation, Loading And Transport And Soil. Af_09/2024, Infrastructure - Manual Trench Excavation. Af_09/2024, Applied To Crowning Blocks Or Footings, Manufacture, Assembly And Dismantling Of Formwork For Footings, In Sawn Wood, E=25 Mm, 4 Uses. Af_01/2024, Assembly And Disassembly Of Formwork For Baldrame Beams, Assembly And Disassembly Of Formwork For Rectangular Pillars And Similar Structures, Simple Straight Leg, Made Of Resin Plywood Sheet, 4 Uses. Af_09/2020, Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 10 Steel, Shoe Concreting, Fck 30 Mpa, Using A Pump - Launching, Thinning And Finishing. Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, Concreting Of Pillars, Fck = 25 Mpa, Densification And Finishing. Af_02/2022_Ps, Manual Trench Backfilling, With Percussion Soil Compactor. Af_08/2023, Basement Masonry With Structural C Block
|