|
Networking Of Various Locations At Gandhinagar Campus , Networking Of Various Locations At Gandhinagar Campus , Part A : Material , Patch Panel For Rack : Copper, Patch Panel, Tera / Max, Empty, Shielded, 24 Openings, Flat, 1U, Black, Fixed Wire Manager , Network Io User Side : Copper, Outlet, Tera, Shielded, Category 7A/8, Tera, Flat, Black, Tool-Less, T568a/B, With Door, 22-23 Awg - User Side , Network Io Rack Side : Copper, Outlet, Tera, Shielded, Category 7A/8, Tera, Flat, Black, Tool-Less, T568a/B, With Door, 22-23 Awg- Panel Side , Face Plat User Side : Faceplate, 10G, British, Single Gang, 2 Openings, Mx, White , Fibre Cable Single Mode : Cable, 6 Fibre, Xglo, Singlemode, Os1/Os2, 8.3/125, Outside Plant, Loose Tube, Armored, Mdpe, Black, 1 Kilometer, International , Fibre Liu For Fibre Termination On Both Sides : : 12 Port Fibre, Enclosure, Lightverse Core, Rack Mount, 1U, Fixed Access, 4 Openings, Black - Fully Loaded - (With Required Accessories : Glo® Jumper & Pigtails - 192 : Quick-Pack® Ric Splice Cassette (Rsc) - 192 : Lc Blade Patch Fibre Jumpers - 8 : Fibre, Adapter Plate, Light Verse, Flat, Black Housing, Blank - 24 : Splice Cassette And Trays - 8" , Rack:Wall Mounted Enclosure Of Dimension 600W X15ux600d With Front Sheet Steel Glass Door, Top And Bottom Cover With Cable Entry Provision, Integrated Side Walls, 1 Pair Of 19"" Angles With Wall Mounting Provision, Captive Hardware(Pack Of 20).Color Ral 7035 230V Ac Fan, 90 Cfm With 1 Mts Long Cable. 19"" Mountable Socket Strips With 6 Nos Of 5A Universal Sockets With 2 Mts Long Power Chord. 1U 19"" Horizontal Cable Manager (Zinc Blue Plated) Wall Bracket Kit 10Mm (Pk Of 4) " , 40Mm 6Kg Isi Make Hdpe Pipe For Fibre Laying , Part B : Labour , Labour: Laying Of Hdpe Pipe For Fibre , Labour: Laying Of Utp Cable Along With All Accessories Which Includes 32 Mm Conduits With Accessories, Trunking And Casing Capping As Per The Requirement (Bidder To Select The Accessory Material As Per The Specifications Defined In Section 6) (Actual Meter Reading Generated During The Cable Testing Will Be Considered For Payment) , Labour: Laying Of Fibre Cable In Pre Laid Conduits And Trunks , Labour: Fixing Of Rack Upto 18 U Size With Dressing , Labour: Fixing Of Patch Panel In The Rack Along With Termination Of Cable , Labour: Termination Of Cat7a Io On The User Side , Labour: Termination Of Cat7a Io On The Jack Panel Side , Labour: Fixing Of Liu In The Rack , Labour: Fibre Splicing Per Core , Labour: Labelling And Feruling Charges , Labour: Fibre And Copper Certification Charges (Third Party). Copper Certification To Be Done Using Cat7a Tester(Old Cables Are Not Include.)
|