|
The Subject Of The Order Is The Drainage Of Rainwater In Stąporków From Ul. 1000-Lecia And Parts Of Ul. Piłsudskiego, Ul. Słowackiego, Ul. Konopnicka, Ul. Krasińskiego And Ul. Reja And Reconstruction Of The Sanitary Sewage System At Ul. 1000Th Anniversary. The Scope Of The Investment Project Includes: 1) Part 1 (Part Co-Financed Under The Project No. Fesw.02.05-Iz.00-0015/24 Entitled Increasing The Adaptation Of The City Of Stąporków To Climate Change Through The Construction Of A Stormwater Drainage Network), And Within It: Task 1. Construction And Reconstruction Of A Stormwater Drainage System In The City Of Stąporków: A) Reconstruction Of The Stormwater Drainage Network In The Strip Of National Road No. 42 (Part Of Ul. Piłsudskiego) By Replacing A Section Of The Storm Sewage System Made Of Dn 500 And Dn 600 Concrete Pipes With Double-Layer Pp Dn 600 Pipes, Class Sn 8, 0.0262 Km Long, And Installing (Along The Route Of The Existing Channel) Devices For Pre-Purifying Rainwater And Meltwater, I.E. A High-Efficiency Coalescing Separator With A By-Pass And High-Efficiency Single-Chamber Vertical Sedimentation Tanks Made Of Prefabricated Reinforced Concrete Elements With Appropriate Efficiency And Hydraulic Capacity, And Construction Of S2 And S3 Inspection Wells Dn 1200 Mm, Reinforced Concrete Structure, Along The Route Of The Existing Canal (Collectors) Made Of Structural Pipes, Min. Class Sn8, Double-Layer, Diameter Range Dn 200, 250, 300, 400, 500, 600: With A Length Of 0.7689 Km And Construction Of Sewers Made Of Pvc Pipes Ø 160 Mm, Sdr 34, Min. Class Sn8, Length 0.1545 Km (Total: 0.9234 Km); Inspection Chambers Made Of Concrete Elements, Dn 1200 Mm, With Cast-Iron Channel Manholes, Ø 625 Mm, Class D400 - 24 Sets, And Inspection Chambers Dn 1200 Mm Made Of Concrete Elements, With A Cast-Iron Street Inlet, Class D400 - 5 Sets; Sr1, Sr2, Sr3, Sr4, Sr5, Sr - 6 Sets; Street (Well) Inlets Dn 500 Mm With A Settling Tank And A Cast Iron Grate, Class D400 - 36 Sets; Linear Drainage Type V300 With A Cast Iron/Steel Grate, 17.00 M Long; Concrete Bed With A Length Of 17.60 M. Task 2. Construction Of Blue-Green Infrastructure Elements: A) Riverside Vegetation, B) Plant Passage, C) Garden Bed, D) Construction Of A Permeable Surface, I.E. Strengthening The Slopes Of The Drainage Channel With Openwork Slabs.2) Part 2: Reconstruction Of A Section Of The Sanitary Sewage System At Ul. 1000-Lecia In Stąporków By Replacing The Section Networks Of Dn 200 Mm Vitrified Clay Pipes With Dn 200 X 5.9 Mm And Dn 250 X 7.3 Mm Pvc Pipes, Classes Min. Sn - 8, Over A Length Of 150 M, Comprehensive Replacement, Along The Route Of The Rebuilt Section Of The Sanitary Sewage Network, Of Sewage (Network) Chambers, Marked With The Symbols: S4 – S3 – S2 And S6, With New Dn 1200 Sewer Wells Mm From Prefabricated Concrete Elements. The Detailed Description Of The Subject Of The Order Is: - Annex No. 1 To The Swz - Description Of The Subject Of The Order - Annex No. 2 To The Swz - Desi
|