|
Siteworks – Construction Site Setup. Scope Of Services / Rough Quantities: The Tlrz Data Center Location At Ludwig-Erhard-Ring 2 In Erfurt Is To Be Expanded And Modernized To Meet The Ever-Growing Requirements Of The Thuringian State Administration. The Free State Of Thuringia, Ultimately Represented By The Thuringian State Office For Building And Transport, Intends To Carry Out A Thorough Renovation Of The Existing Building And A Structural Expansion Of The Data Center On The State-Owned Property On The Site Of The Authority Center At Ludwig-Erhard-Ring 2 In Erfurt. The Location Is On The Ludwig-Erhard-Ring Campus In The Southeast Of The State Capital Erfurt In The Daberstedt District. The Construction Site For The Expansion Is Located North Of The Existing Tlrz Building, Which Was Completed In 2003. In Addition To The Tlrz, The Thuringian Ministry Of Finance (Tfm) As Well As A Canteen Building, Garages And Parking Spaces Are Located On The Campus. Rough Quantities: Set Up, Move And Clear 34 Pieces Of Concrete System Stones. Provide 850 Stmt Of Concrete System Blocks. Deliver 54 M² Of Mobile Construction Road, Clear 324 M²mt Of Mobile Construction Road. Set Up, Move, Clear 240 M Of Construction Fence Secured, H=2.00M. Keep 7920 Mmt Of Construction Fence Secured. 1 Piece Of Construction Fence Gate, H=2.00M. B=4.25M 1 Piece Of Mob. Truck Sliding Gate, H=2.00M, W=7.00M 135 M Mob. Set Up Security Fence, H=2.40M, Move, Clear 5 Pieces Of Mob. Security Fence, Corners 90°, H=2.40M 1080 Mmt Mob. Safety Fence Provided 2 Pieces Of Truck Gate, 2-Wing, H=2.40M, W=5.00M 2 Pieces Of Door, 1-Wing, H=2.40M, W=1.20M 1 Piece Of Electromechanical Turnstile (Person Isolation) Rfid Control 1 Piece Of Construction Sign, Set Up The Supporting Structure, Clear It, Keep It Ready 1 Piece Of Toilet Cubicle / Chemo Toilet Set Up, Clear 12 Stmt Toilet Cabin / Chemo Toilet, Set Up 1 Piece Of Toilet Container, 20-Foot / 15 M², Clear Up 32 Stmt Toilet Containers, Set Up 1 Piece Of Office / Consultation Container, 2X 20-Foot / 30 M², Set Up, Clear Up 32 Stmt Office / Consultation Containers, Keep 1 Piece Of Display 86, Non-Interactive, Clean Up Traveling Stand, Set Up, Clear 32 Stmt Display 86, Non-Interactive Keep 1 Piece Guard Container, 10-Foot / 7.5 M² Set Up, Clear 32 Stmt Guard Container Keep 1 Piece Security Container Rc2, Set Up 3X 20-Foot / 45 M², Clear 8 Stmt Security Container Rc2 Keep 3 Pieces Temporary Drop-Down And Entrance Platforms With Stairs 40 M² Temporarily Close Existing Opening In Wall Surfaces 8 Pieces Of Construction Door, 1-Wing, 1.00/2.00 M Install, Adjust, Clear 2290 M² Protection Of Finished Floor Areas, Install Fleece + Hardboard 79 Pieces Of Protective Cover For Stair Steps/Platforms, Fleece + Osb Panels 64 H Clearing Of Floor Areas, Building Rubble, Packaging, Garbage 4 Rubble Containers Up To 7 M³ Set Up, Loaded, Removed 28 M³ Disposal Of Mixed Construction And Demolition Waste 4580 M² Intermediate Cleaning Of Floor Areas, Vacuum
|