|
The Public Order Is For The Preparation Of An Investment Project In The Technical Design Phase, The Preparation Of An Assessment Report For The Compliance Of The Investment Project In Accordance With Art. 142, Para. 6, Item 2 Of Zut; Execution Of The Construction And Installation Works Specified In The Bill Of Quantities Attached To The Technical Specification And For Exercising Authors Supervision For The Site: Repair And Restoration Of The Building Of The Ngpi Trevnenska Shkola, Located In The Pi With Identifier 73403.501.466 According To The Cc And Kr Of The Town Of Tryavna And Upi Ii, Quarter 100 According To The Regulatory Plan Of The Town Of Tryavna, Gabrovo District. The Investment Project Must Be Prepared In The Technical Phase In All Parts, In Accordance With The Applicable Regulations, To Ensure Safety, Sustainability And Energy Efficiency Of The Building, As Well As Full Operation After The Repair. It Also Includes The Preparation Of A Technical Passport, A Safety And Health Plan, A Construction Waste Management Plan And Detailed Accounting Documentation. The Construction Must Ensure Complete Restoration And Repair Of The Building Of The Ngpi Trevnenska Shkola After The Fire, Complying With All The Requirements Of The Zut And The Applicable Regulations. Restoration Of The Roof Structure Is Required - Complete Removal Of The Temporary Roof, Construction Of A New Roof With The Necessary Superstructures, Hydro- And Thermal Insulation, Chimneys And Drainage System; Renovation Of The Facades - Implementation Of Thermal Insulation And Silicate Plaster, Restoration Of Damaged Areas And Replacement Of Compromised Window Frames.; Repair Of Interior Rooms - New Flooring, Plasters, Plasters, Suspended Ceilings And Restoration Of Authentic Elements; Identification Of A Usable Under-Roof Level.; Replacement And Repair Of The Installations - Revision And Replacement Of The Electrical, Plumbing And Hvac Installations; Installation Of New Lightning Protection, Grounding And Ensuring Fire Safety.;Improving The Structure - Structural Survey, Determination Of Load-Bearing Capacity And, If Necessary, Reinforcements And New Elements.;Ensuring An Accessible Environment, Energy Efficiency And Fire Safety - According To Ordinance No. Rd-02-20-2, Ordinance 7 On Ee And Ordinance I-1971.;Organization Of Construction - Preparation Of A Safety And Health Plan, Plan For Construction Waste Management And Compliance With All Safety Regulations. All Construction And Assembly Works Must Be Performed With Quality Materials, Certified According To Bds, And In Accordance With The Design Of Architecture, Structures And Installations. The Requirements For The Preparation Of The Technical Project, For The Execution Of The Construction, Installation And Repair Works And The Exercise Of Authors Supervision For The Object Are Indicated In The Technical Specification Of The Order.
|