Construction Work – Shell Construction Work. Shell Construction Work On The Foundation/Floor Slab - Preparation Of The Foundation Cushion, In Particular Production Of Fine Subgrade, Soil Replacement, Subsequent Compaction And Production Of The Foundation Cushion Of The Base Slab. - Shallow Foundation As A Load-Bearing Reinforced Concrete Slab With Integrated Underground Pipes. - In Some Areas Individual Foundations And Point Foundations, Partly In Well Ring Construction. Sealing Work - Sealing The Foundation Area As A So-Called Black Tub. - Sealing Connection Areas, Underground Cables, Cable Bushings, Base Plate. Reinforced Concrete Skeleton Construction - Base Areas And Main Zones, Upper Floors In Reinforced Concrete Skeleton Construction With A Basic Grid Of 8X8m. Basic Structure Made Of Rectangular Columns And Flat Ceilings In Reinforced Concrete, Installation And Access Cores In Reinforced Concrete As Stiffening Elements. - Partial Areas With Load-Bearing Wall Panels In Bulkhead Construction And Designed As Wall-Like Supports. - Non-Load-Bearing Walls Made Of Reinforced Concrete As Internal Partitions And As A Substructure Of The Facade. Exposed Concrete - Execution Of Reinforced Concrete Constructions According To Specifications, Some In Exposed Concrete Qualities Sb 1-3. Wood Hybrid Ceilings - Ceilings Of The Nursing Rooms And Service Rooms On The 3Rd And 4Th Floors In Wood Hybrid Construction With Glued Laminated Timber Trusses On Stb Consoles And A Reinforced Concrete Layer Connected To Them In A Force-Fitting Manner. Wooden Roofs - Roofs Of Technical Centers, Modules 2 And 4, 6Th Floor And Patient Access On The Ground Floor. Module 1 As A Load-Bearing Wooden Structure With Glued Laminated Timber Trusses On Stb Consoles, With A Board-Plywood Ceiling Above. Steel Composite Construction - Steel-Concrete Composite Construction Over Several Levels Connected To An Existing Building. Core Drilling/Masonry Work - Core Drilling And, To A Small Extent, Masonry Work In The Area Of The Shaft Openings. Steel Construction/Built-In Parts/Shaft Scaffolding - Steel Construction Work And Temporary Shaft Scaffolding For Installation Work. - Installation Parts And Provisions, Among Other Things, For Later Construction Of The Helipad. Connection To Existing Buildings - Partial Demolitions And Creation Of Connections To An Existing Building Over Several Levels.
Contact Information
Address
Ammerlandallee 12
Contact No.
+49 448856-1500
Email
vergabe@ammerland.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105266912
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.