Underground Work Other Than Tunnels, Shafts And Subways – Pipe And Civil Engineering Work On The Wsa Site. Pipeline Construction: The Main District Heating Pipeline Is Laid In The Ground Using An Open Construction Method. A Factory-Insulated Steel Pipe With A Plastic Jacket (Kmr) Is Used As The Pipe System. The Brandes System Will Be Used As A Leak Warning System For This Purpose. The Line Is Installed In Accordance With The Generally Recognized Rules Of Technology And Taking Into Account The Applicable Standards And Regulations (E.G. Agfw Regulations). Civil Engineering: Civil Engineering Work Includes Conventional Earth Excavation To Create The Pipe Trench, Backfilling With Suitable Material And Restoring Surfaces In The Areas Of Streets, Sidewalks And Private Driveways. Necessary Safety Measures And Coordination With Other Supply Lines Must Be Taken Into Account.
Contact Information
Contact No.
+49(4852)838432
Email
salz@eg-westholstein.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105266730
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.