This Project Consists Of Demolition And Removal Of Existing Public Sewer Main And Storm Drainage Networks, And The Proposed Improvements Include Storm Sewer, Sanitary Sewer, And Water Utility Infrastructure. These Improvements Will Be Constructed Along Two New Local Streets That Will Connect W. White St And Abby Lane. The Demolition And Removal Of Storm Sewer Networks Consist Of Approximately 201 Lf Of Pipe And 3 Structures. The Installation Of Proposed Storm Sewer Networks Consists Of Approximately 1900Lf Of Pipe, And 27 Structures. The Demolition And Removal Of Sanitary Sewer Networks Consist Of Approximately 1207 Lf Of Pipe And 4 Structures. The Installation Of Sanitary Sewer Networks Consists Of Approximately 1343 Lf Of Pipe And 10 Structures. The Installation Of Public Water Main Consists Of Approximately 1633 Lf Of Pipe, 4 Fire Hydrants, And 56 Water Service Lines And Meters. Erosion, Sedimentation And Pollution Control Measures Must Be Implemented, Maintained, And Removed Post-Installation. The Contractor Will Be Required To Maintain Good Communication And Coordination With The Project Engineer And City Engineer Through The Entire Duration Of Construction Activity.
Contact Information
Contact Person
Dalton Appleby
Contact No.
7708302000
Email
dappleby@carrollton-ga.gov
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105178199
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.