Rubber And Plastic Materials – Supply And Production Of Elastomer Components For The Olympic Tent Roof. Manufacture And Delivery Of Flame-Retardant Elastomer Components For Renovation Or New Roofing Of The Olympic Tent Roof In The Munich Olympic Park (Bavaria, De). The Olympic Tent Roof Extends Over A Total Area Of Approx. 78,000 M² And Spans The Olympic Stadium, Open Areas (Intermediate Roofs) As Well As The Olympic Hall And Olympic Swimming Pool. Swm Services Gmbh Is Planning The Entire Renovation Of The Roof Structure Between 2026 And 2029. The Renovation Of The Olympic Tent Roof Is Being Carried Out In Several Construction Phases. In The First Construction Phase, The Olympic Stadium, Only The Quantities For The Olympic Stadium And The Connecting Intermediate Roof Will Be Called Up. The Timing Of The Construction Phases Is Planned As Follows: Ba1: Olympic Stadium (Bw3) Including Intermediate Roof // August 15, 2026 - October 10, 2028 Ba2: Olympic Hall // August 3, 2027 - July 13, 2029 Ba3: Olympic Swimming Hall // August 18, 2026 - June 13, 2029 The Roof Skin Is In Place Made Of Acrylic Glass Plates (Pmma), Which Are Clamped Between The Support And Cover Plates (Epdm) And Floating On Point Holders (Rubber-Metal Buffer Made Of Chloroprene Rubber). So-Called Joint Tapes (Epdm) Are Inserted Between The Acrylic Glass Roof Panels To Enable The Movement Of The Roof Panels And Orderly Roof Drainage. The Elastomer Components Offered Here (Rubber-Metal Buffers, Cover Plates, Support Plates And Joint Tapes) Must Meet Specific Requirements And Are Subjected To A Compatibility Test With The Acrylic Glass Roof Panels, Here The Plexiglas Product, As Part Of The Award Process. Only Those Offers That Have Passed The Compatibility Tests With The Acrylic Glass Roof Panels Already Purchased Will Be Considered For The Contract. Delivery Services Lot 1: • Hot Vulcanizing Devices: 16 Pieces At The Beginning Of The Renovation • Joint Tape: 800 To Max. 1300 Running Meters Per Week // Total: Approx. 65,800 Running Meters (Ba1 36,100 Running Meters, Ba2 18,200 Running Meters And Ba3 11,500 Running Meters) In T, Y And X Fittings With Various Leg Lengths • Cover, Support Plates And O-Rings: 2000 To Max. 3200 Pieces Per Week // Total: Approx. 156,000.00 Pieces (Ba1 85,000 Pieces, Ba2 44,000 Pieces, Ba3 27,000 Pieces) Delivery Services Lot 2: • Buffers: 2,000 To Max. 3,200 Pieces Per Week // Total: Approx. 156,000.00 Pieces (Ba1 85,000 Pieces, Ba2 44,000 Pieces, Ba3 27,000 Pieces) Note: The Application For Participation Can Be Submitted For One Lot Or For Both Lots.
|