Construction Work For Power Plant – Rfb, Los 3: Schiffsentlader, Projekt Reuter Future Biomass. The Subject Of This Tender Is The Procurement Of A New Ship Unloader, Which Is To Be Understood As Lot 3 Of The Overarching Reuter Future Biomass Project. Within This Framework, The New Construction Of Ship Unloader 1 (Hydraulic Crane) Including A Hopper Is Planned. According To The Planning, The Material To Be Handled Includes Short Rotation Plantation Wood (Kup), Landscape Maintenance Material (Lpm), Waste Wood A1 - A4. In Addition, The Services To Be Provided Include The Installation Of A New Conveyor Belt System And Dust Reduction Measures. The Following Technical Specifications Are Planned With Reservations, As Changes Are Possible: - (Hydraulic Crane) Including A Hopper That Can Accommodate And Equalize The Fuel - Installation Of A New Conveyor Belt System - Connected Load 400 Vac - Installation On Existing Rails: Track Gauge 7.95 M - Average Unloading Performance 480 M³/H, Max. Unloading Performance: 750 M³/H - Dust Reduction Measure When Dropping Over Spraying System (E.G. Spraying With Water) - Hydraulic Quick Change Of The Grab Should Be Possible (Change From Multi-Shell Grab To Clamshell Grab) - A Funnel Should Be Able To Hold The Maximum Quantity And Continuously Feed The Fuel Onto The Quay Conveyor Via A Plate Conveyor Or Similar Equalization Measure.
Contact Information
Address
Hildegard-Knef-Platz 2
Contact No.
+49 302670
Email
eu-vergabe@bew.berlin
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105167029
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.