It Includes All The Necessary Works That Involve The Construction And Assembly Of The General Panel And The Power Distribution Panel, Lighting And Control Of Ssr Puente Ñuble. The Entire System Has A Backup Of A Generating Set Which Will Operate In The Event Of Power Outages From Copelecs Electrical Distribution Network. The Contractor Will Be Responsible For The Supply, Transportation And Assembly Of The Necessary Elements For The Correct And Regulatory Installation Of The Items Of This Project. Additionally, You Should Consider Removing Existing Facilities. The Supply, Transportation And Installation Of A General Panel Installed On The Opposite Side Of The Splicing Structure Is Considered. The Existing Panel Must Be Removed, For This The Opening Of The Mv Line Must Be Coordinated With The Energy Distribution Company, Value At The Contractors Cost. The Assembly Will Be Using A 42X42 Mm Unystrut Rail. All Connections Of The Power Feeders To And From The Panel Are The Responsibility Of The Contractor. Also Consider The Supply Of Nails, Terminals, Markers And Everything Required For The Correct Connection. The Cabinets Will Be Ip55, Ik10, Resistant To Uv Rays, They Will Have A Mounting Plate For The Installation Of The Protection And Control Elements, A Cover Covering Equipment And An Outer Cover. The Doors Will Be Hinged And Will Allow An Opening Angle Of 110 Degrees. They Will Be Equipped With A Lock And Key. The Wiring Of The Panels Will Be Made With Flexible Cable, Whose Current Capacity Will Be 25% Higher Than The Capacity Of The Installed Elements And According To The Calculation Memory, Also Respecting The Color Code. The Ends Of All Conductors Will Be Duly Labeled Using Plastic Tapes. All Elements Of The Boards Will Be, In Terms Of Their Function, Duly Labeled Using Black Acrylic Plates With White Letters. A Complete Wiring Diagram Of The Panel Must Be Included In Laminated Form, Which Will Go In A Plan Holder Visibly On The Panel. The Contractor Will Be Responsible For Replacing Any Equipment, Elements And Accessories That Fail Or Are Destroyed As A Result Of The Assembly Activities Carried Out By Him.
Contact Information
Contact Person
Daniela Moraga Cancino
Address
Arturo Prat 202 - San Nicolás
Email
Dafnicolas@Gmail.Com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105101598
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.