|
Works For Complete Or Part Construction And Civil Engineering Work – Development Of The Rn2 And Between The Bourbier Interchange And The Plaines Roundabout In Saint-Benoît - Lot 1: Preliminary Civil Engineering Works - Vrd - Demolitions. The Work Consists Of: - Site Installation Which Includes In Particular The Sps Regulatory Site Signs, Land Development, Including The Supply And Implementation Of Materials For The Creation Of Site Installation Platforms, Storage Areas, Deposit Areas, Development Of Specific Accesses On The Public Highway, Their Maintenance And Cleaning, Sanitation And Maintenance Of These General And Complementary Site Tracks And Platforms, Electrical Installations, Common Safety And Hygiene Installations, Non-Exhaustive List - Phasing Including Nights And Temporary Works: Securing The Execution Of Works, Investigations, Supply, Installation, Implementation, Maintenance, Modifications Depending On The Phasing Of Horizontal And Vertical Signaling (Police, Directional And Information); As Well As The Removal, Removal, Erasure, Demolition, Restoration At The End Of The Intervention, Guarding, Restoration At The End Of Each Phase And At The End Of The Work, All Costs Necessary For The Missions And Interventions...., Maintenance, Implementation Of All Safety Equipment, Marking, Supply And Implementation Of Fencing On Mobile Security Barriers, Non-Exhaustive List - Supply And Installation Of Site Information Panels, - Supply And Installation Of Communication Information Panels Including The Characteristics Of The Market - Approved Bailiffs Report Allowing Certification Of The State Of Neighboring Constructions, .... - Internal Control Including Site Laboratory, - Management Of Waste Treatment - Temporary Sanitation During The Construction Phase (Development Linked To The Management Of Rainwater In The Area Of The Works, Preservation Of The Environment In Compliance With The Rainwater Management Directives During The Works Phase Described In The Prefectural Decree And The Environmental File) - Waterproof Storage Area, Supply, Implementation And Withdrawal Of Pumps, ..., Restoration Of The Premises .... Management Of The As-Built Plan, Doe, - Establishment And Topographical Monitoring Of The Site, - Preparatory Work - Clearing Of Rights-Of-Way, - Clearing Of Brush, Felling And Stumping Of Trees, - Demolition Of Masonry, Reinforced Concrete, Unreinforced Concrete... - Demolition Of Masonry Works Including Fence - Gate - Gate, .... - Earthworks, Stripping Of Topsoil With Storage, Purging, Earthworks In Excavations In The Field ... Of All Kinds With Evacuation ... Topsoil From Storage, - Creation Of Concrete Layers, ... Bituminous Concrete, Curbs And Sidewalk, Pedestrian Path - Lengthening, Pipe Protection Concrete, Emergence Rating, Plumbing, Rainwater Sanitation Networks, Earthworks, Excavations, Pvc Pipes And Networks, Hdpe Pipes And Networks, - Supply And Installation Of Massive Anchors, Supply And Installation Of Candelabra, Electrical Work.. L
|