Construction Work – Doc2716953486_Uw Zermeiggern Los 10 Baumeister. Project: 220 Kv Uw Zermeiggern (Vs), Construction And Auxiliary Systems. The Mattmark Dam Is The Largest Earth Dam In Europe. The Two-Stage Energy Production Of The Mattmark Reservoir (Storage Volume 100 Million M3) Takes Place In Zermeiggern And Stalden. The Uw Zermeiggern Substation Is The Grid Connection Point Of The First Stage Of The Mattmark (Kwm) And Partners (Swissgrid, Fmv Forces Motrices Valaisannes, Gd Grande-Dixence) Power Plants. As The Client, Swissgrid Is Now Planning To Replace The Sas As Well As The Secondary Technology And Communication. A New Substation Building Will Also Be Built In Accordance With The Internal Swissgrid Standards. Swissgrid Is Also Unbundling The Secondary Technology And Building Its Own Ancillary Systems. Subject: The Subject Of This Procurement Procedure Includes The Awarding Of The Following Work: • Construction Site Equipment Including Temporary Construction Wall, Fencing And Other Safety Precautions • New Construction Of Substation Buildings: Excavation Work, In-Situ Concrete Work, Use Of Prefabricated Elements For Walls And Ceilings, Core Drilling • New Construction Of Cable Systems With Cable Shafts/Cable Ducts (Buried) • New Construction Of Water And Wastewater Connections, Infiltration System • Connection Of Existing Fencing To The New One Building • New Construction Of Access Road With Asphalt Surface For More Detailed Information, See C Documentation.
Contact Information
Address
Bleichemattstrasse 31
Contact No.
+41585802111
Email
ausschreibungen-bau@swissgrid.ch
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 104968592
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.