|
Prior Information Notice For Laboratory Services – 3Rd Party Testing Lab Facility (Soil And Concrete). Experienced And Qualified Companies Are Invited To Provide Onsite And Offsite Testing Laboratory Facilities And Testing Services With Concrete, Grout, Bituminous Paving And Soil Capabilities (Commodity Code Sy01). This Is To Support The Construction Of The Poland Nuclear Power Plant. The Scope Of Work Includes Providing Comprehensive Labor, Supervision, Materials, Equipment, And Technical Services To Operate On-Site And Off-Site Testing Facilities. This Includes Sampling, Testing, Mapping Test Locations, And Reporting Results In Strict Compliance With Subcontract Documents, Applicable Polish National Standards And Project Specifications. Interested Companies Must Register/Update Their Contractors Information In Bechtels Isupplier Portal At Https://Supplier.Becpsn.Com Link And Select Commodity Code Sy01 As Their Specialty. If Contractor Has Any Questions Or Intends To Express Interest In Bidding This Requirement, The Company Shall Notify Bechtel’S Contact Person. At That Point, Bechtel Shall Provide The Interested Party The Poland Prequalification Questionnaire Which Company Would Complete With Response To Bechtel For Review. Bechtel Notes That Previous Proven Experience With Testing Services Of Similar Scale And Complexity Will Be Mandatory And Providing Additional Documentation / Evidence Of Previous Experience May Be Required. The Rfq Document Will Include The Scope Of The 3Rd Party Testing Laboratory Facilities For Concrete And Earthwork (Soils) On The Poland Ap1000 Project. The Company Must Deliver Fully Operational Testing Laboratory Facilities—Both Onsite And Offsite Capable Of Performing All Required Soil, Concrete, Grout, And Bituminous Paving Tests. This Includes Providing All Necessary Labor, Supervision, Materials, Equipment, Tools, And Technical/Professional Services. The Company Is Responsible For Obtaining And Maintaining All Relevant Permits, Certifications, And Licenses For Personnel, Equipment, And Vehicles, And Must Ensure Compliance With National Standards And Project Specifications. Before Mobilization, The Company Must Submit And Obtain Approval For Key Documents Such As The Environmental, Safety And Health Program And The Quality Control Program. During Execution, The Company Must Maintain Safe, Clean, And Orderly Facilities, Provide All Required Utilities, And Ensure Proper Sample Handling, Storage, And Documentation. The Company Is Also Responsible For Preparing And Submitting Timely Test Reports, Maintaining Calibration And Certification Records, And Supporting Bechtel In Regulatory Compliance And Environmental Management. Upon Completion, The Company Must Demobilize All Temporary Facilities And Submit All Required Closeout Documentation, Ensuring That All Work Is Performed To The Standards Of Good Industry Practice And In Accordance With The Contract Documents. The Company Is Required To Have An Iso 9001:2015 Certified Quality Management System. Seller’S Activities Will Need To Comply With Polish Law And Nati
|