Bridge Construction Work – St2315 Brueckenbau Ba3 Bw1. L2315 Hafenlohr Bypass With Integrated Flood Protection Measures, Construction Phase 3, New Building 1. Demolition: 120 M3 Demolition Of Reinforced Concrete; 80 M3 Demolition Of Masonry; 300 M2 Of Paving/Embankment Paving. New Bridge Structure: 9,000 M3 Of Earthworks; 850 M2 Sheet Piling; 180 M Bored Piles; 850 M3 Of Concrete Work; 200 M2 Asphalt Works; 1 Flood Protection Gate.