Miscellaneous Repair And Maintenance Services – Maintenance Of Flood Embankments And Embankment Locks In Nw Kęty In 2026-2027. Continued Section Bt-24 Scope Of Maintenance Works: Embankment Culverts, A) Checking The Patency Of The Embankment Lock Conduits, Removing Rubbish From Under The Flaps And Dams From The Outflow, Clearing Snow And Ice, B) Maintenance And Maintaining The Working Order Of The Gate Closing Mechanisms On The Embankment Lock Conduits, C) Replenishing Concrete Losses On The Inlet And Outlet Abutments, D) Improving The Insurance At The Inlet And Outlet Locks, E) Cleaning Rust And Painting Metal Non-Return Flaps And Cleaning Plastic Non-Return Flaps And Hatches To The Embankment Lock Conduits (At Least Once A Year And After The Flood Wave, If Necessary), F) Regular Replacement Of Worn Or Damaged Seals At The Embankment Lock Flaps, G) Cleaning The Stairs On The Embankment Slope, As Well As At The Inlet And Outlet Of The Locks, H) Desilting The Grooves At The Inlet And Outlet Locks At A Length Consistent With The Size Given In Annex No. 1, I) During The Grass Growth Period, Mowing The Inflow And Outflow Ditches From The Embankment Locks Three Times, Together With A Rake (In Accordance With The Size Given In Annex No. 1) On The Following Dates: The First Mowing By May 31, The Second Mowing By July 31, The Third Mowing By September 30. Flood Embankments A) During The Grass Growth Period, Mow The Crown And Slopes Of The Embankment Three Times Within The Embankment Locks Over A Length Of 20 M (10 M In Each Direction From The Lock Axis) On The Following Dates: - First Mowing By May 31, - Second Mowing By July 31, - Third Mowing By September 30; B) Scattering Molehills And Eliminating Burrows Made By Animals In The Embankment Body, Which Can Be Made Using Hand Tools, And Reporting Immediately The Location Of Burrows And Damage To Embankments Made By Animals In The Embankment Body, Requiring The Use Of Specialized Equipment (Excavator, Compactor) For Liquidation. C) Cutting Down Self-Seeded Trees And Bushes From The Slopes And The Top Of The Embankment And The Strip Adjacent To The Foot Of The Embankment At A Width Of 3 M - (Applies To Plots Administered By Pgw Wody Polskie). The Detailed Scope Of The Order As Well As The Standards And Requirements For Its Implementation Are Specified In The Procedure Documentation, Including In Particular The Draft Contract Constituting Annex No. They Act As Bills Of Quantities.
Contact Information
Contact No.
+48 12 62-84-303
Email
krakow@wody.gov.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 104535094
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.