Surface Coating Construction Work – Nagyszombati Út Ii. Pace Execution. Total Length Of Road Construction: 825M Demolition, With Removal To Landfill Or Recycling: 700 M3 Excavation Of Soil, Removal To Landfill: 5600 M3 Spreading Of Geotextile: 8312 M2 Construction Of Fzka Base Layer: 2051 M3 Construction Of M56 Base Layer: 543 M3 Backfilling: 88 M3 Construction Of Ckt Road Base: Construction Of 1,330 M3 Of Paving Stones: 2,195 M2 Construction Of Asphalt Track Structure: 1,072 M2 Of Curb Construction: 2,545 M Placement Of Kresz Signs: Painting Of 32 Pavement Signs: Construction Of 403 M2 Storm Drains: 358 M Of Water Sinks And Manhole Constructions: Construction Of 23 Paved Trenches From Prefabricated Elements: Placement Of 537 M Public Lighting Pole: 1 Pc. Installation Of New Lamps: 3 Pcs. Reconstruction Of Drinking Water Pipes: - D280 Mm Kpe Pipe Pe100, Sdr17 770 Fm - D180 Mm Kpe Pipe Pe100, Sdr17 16 Fm - D110 Mm Kpe Pipe Pe100, Sdr17 62 Fm - D25 Mm Kpe Pe100, Sdr11 Water Connection 1 Pc - D25 Mm Kpe Pe100, Sdr11 Water Connection 1 Pc - D32 Mm Kpe Pe100, Sdr11 Water Connection 32 Pcs
Contact Information
Contact No.
+36 22537644
Email
hegyesi.erzsebet@pmhiv.szekesfehervar.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 104485335
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.