|
Work Sign, Topographic Services, Construction Site Administration, Mobilization Of Teams And Equipment, Mechanized Cleaning Of Vegetation Layer Vegetation And Small Trees Trunk Diameter Less Than 0.20M With A Crawler Tractor. Af 05 2018, 04/11/2025 - 13:30:10, 04/11/2025 - 13:30:27, 04/11/2025 - 13:30:28, 04/11/2025 - 13:30:31, Transport With 10M Dump Truck Highway In Bed Natural, Vertical Excavation For Infrastructure With Loading, Unloading And Transporting Soil Of 1 Category With Hydraulic Excavator Cacamba 0 8 M 111 Hp Fleet Of 3 Dump Trucks Of 14 M Dmt Up To 1 Km And Average Speed 14 Km H. Af 05 2020, Spreading Of Material With Crawler Tractor. Af 11 2019, Execution And Compaction Of Landfill With Predominant Clay Soil Exclusive Soil Excavation Loading And Transport. Af 11 2019., Execution Of Landfill With Material From Exclusive Material Deposit And Transportation., Transportation With Dump Truck Of 10 Paved Highway, Regularization And Compaction Of Subgrade Of Predominantly Clayey Soil. Af 11 2019, Mechanized Trench Excavation With Prof. Up To 1 5 M Average Upstream And Downstream One Composition Per Retroexcavation Section. 0 26 M Width. Less Than 0 8 M On 1St Category Soil In Locations With High Levels Of Interference. Af 02 2021., Filling Crushed Stone For Mechanized Launching Drain. Af 07 2021, Preparation Of The Bottom Of A Trench With A Width Of Less Than 1.5M Adjustment Of The Af Natural Soil. 08 2020, Concrete Pipe For Rainwater Collection Networks, 800 Mm Diameter, Rigid Joint Installed In A Location With A High Level Of Interference, Supply And Laying. Af 12 2015., Transport With Truck Body With Capacity Of 11 T And With 45 T.M Crane Paved Road., Mechanized Backfill Of Trench With Backhoe Loader Retro Bucket Capacity 0 26 M Power 88 Hp Width Up To 0 8 M Depth Up To 1 5 M With Soil Without Replacement Of 1 Category With Percussion Soil Compactor. Af 08 2023, Manhole Exit Dn 800Mm Block Masonry., Reinforcement Of The Subbed With Decomposed Basalt And 30 Cm Exclusive Material And Transport., Execution And Compaction Of Base And Or Sub-Base For Simple Graded Crushed Paving, Maneuver Loading And Unloading Of Aggregates Or Soil In 10 M Dump Truck Loading With 3 40 M Loader And Free Unloading, Execution Of Priming With Diluted Asphalt Cm 30, Bonding Painting With Emulsion Rr 2C, Execution Of Pavement With Application Of Asphalt Concrete Bearing Layer, Loading Of Asphalt Mixture In Dump Truck 10 M Unit T. Af 07 2020, Cap 50 70, Cm 30, Rr 2C, Transport Of Bituminous Material With Distributor Tank Truck Paved Highway, Painting Of Road Axle Fold The Asphalt With Retroreflective Paint Based On Acrylic Resin With Glass Microspheres Mechanical Application With Self-Propelled Marker. Af 05 2021, Painting Of Pedestrian Crossing Or Zebrada Cpm Epoxy Paint And 30 Cm Manual Application. Af 05 2021., Bidirectional Tack, Warning Type Signage Plate L 80 Cm Including Support., Regulatory Type Signage Plate D 80 Cm Including Support., Demobilization Of Teams And Equipment, Final Cleaning Of The Work
|