|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure, Supply And Installation Of Corrugated Metallic Tile Siding In Galvalume Steel 0.50Mm White H=2.20M 1, Warehouse Shed Area Of 10.90M2, 12Mm Plywood Sheet And 8X8cm Bridges, Bathroom Rental Chemical, Portatail, Measuring 2.31 M Height X 1.56 M Width, Cafeteria With Plywood Walls. 12Mm And Tips 8X8cm (2 Uses), 10/31/2025 - 16:49:03, 10/31/2025 - 16:58:13, 10/31/2025 - 16:58:14, 10/31/2025 - 16:58:22, 10/31/2025 - 16:58:45, Supply Of 1,000L Fiberglass Reservoir, Water Network With Standard Water Inlet Dia. 3/4, Light Network, Incl. Default Input. Energia Trifás, Rental Of Tubular Scaffolding On Fixed Footings, Formed By Elements 1.50M Wide And High, Demolition Of Simple Concrete Using A Hammer, Manual Demolition Of Reinforced Concrete 2, Removal Of Curbs On Urban Roads, Removal Of Cobblestones, Removal Of Pvc Pipes, Removal Of Cast Iron Covers, Service Of Loading, Maneuvering And Unloading Of Debris In A 10 M³ Dump Truck, Transport With A 10 M³ Dump Truck - Paved Highway, Transport With A 10 M³ Dump Truck - Natural Bed Highway, Mechanical Excavation With A Backhoe In First Grade Material, Compaction Of Landfills At 100% Of The Intermediate Proctor, Acquisition Of Soil From Commercial Deposit (Saibreira) - Differentiated Bdi 15.57%, Loading, Maneuvering And Unloading Of Soil And Granular Materials In A 10 M³ Dump Truck - Excavator, Reconnection Of Water Network In Pvc Dn 25 Mm, Relocation Of Connection And Reconnection Of Sewage Networks, Mechanical Excavation Of Trench In 1St Grade Material Category, Backfill Service With Sand, All Inclusive, Supply And Installation Of Pead Pipe For Drainage - D = 400 Mm, Light Pvc Pipe Ø200mm, Transport Service With Truck Body With 11 T Capacity And 45 Crane, Execution Of Manhole - Pvi 01 - Commercial Sand And Crushed, Manhole Chimney - Cpv 01 - Commercial Sand And Gravel 1, Metal Shoring Of Cage Type Trench, According To Type Project - Use 20 Times, Execution Of Box Drain In Pre-Molded Blocks And Hinged Grille In Ffa On Urban Roads, Monoblock Channel With Concrete Body And Grille Control Load Of 900 Kn - 100.0 X 26.0 53.0 Cm, Pre-Cast Concrete Half Wire (12 Asphalt, Concrete Fck = 30 Mpa - Production In Concrete Mixer And Manual Laying - Commercial Sand And Crushed, Manual Excavation In Mat. 1St Cat. H= 0.00 To 1.50 M, Supply Of Asphalt Emulsion For Priming (Eai), Including Bonus Of 15.28%, Transport Of Bituminous Material With Distributor Tank Truck - Paved Highway, Compacted Commercial Crushed Ballast With Vibrating Socket - Manual Spreading, Execution Of Sidewalk (Sidewalk) Or Concrete Floor With Concrete Molded In Place, Machined, 6 Cm, Hydraulic Tile (Cement And Sand Mortar 1:4), Supply Of Vertical Signage With Synthetic Enamel Sheet, Supply And Placement Of Cones For Signage 1, Vertical Signage With Sheet Covered In Film, Including Support, Supply Of Orange Color Pvc Safety Protection Screen With Support For Signage, Supply
|