|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Psupply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Siding With Metallic Tile. Af_03/2024Siding With Metallic Tile. Af_03/2024, Temporary Water Connection For Construction Siteprovisional Water Connection For Construction Site, Including Hydrometer And Easel For Water Measuring - Main Entrance, In Galvanized Steel Dn 20Mm (1/2) - Dealership Standard, Electricity Input, Overhead, Three-Phase, With Embedded Box, 10 Mm2 Cable And Din Circuit Breaker 50A (Concrete Post Not Included). Af_07/2020_Pelectricity Input, 10 Mm2 Cable And 50A Din Circuit Breaker (Concrete Post Not Included). Af_07/2020_Ps - Sinapi, Conventional Location Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024Conventional Construction Location, 00M - 2 Uses. Af_03/2024 - Sinapi, 10/31/2025 - 14:48:46, 10/31/2025 - 14:49:11, 10/31/2025 - 14:49:15, 10/31/2025 - 14:49:35, Local Administration Of The Worklocal Administration Of Work, Mechanized Cleaning Of Vegetation Layer, Vegetation And Small Trees (Rinco Minor Diameter 0.20M) With Crawler Tractormechanized Cleaning Of Vegetation Layer, 20M) With Crawler Tractor, Mechanized Trench Embankment With Hydraulic Excavator (Dacacamba Capacity: 0.8 Mâ³ / Power: 111 Hp), Width Up To 1.5 M, Depth Of 1.5 To 3.0 M, With Clay-Sandy Soil. Af_05/2016Mechanized Trench Embankment With Hydraulic Excavator (Cacamba Capacity: 0, With Clay-Sandy Soil. Af_05/2016, Manual Excavation For Crowning Block Or Footing (Including Excavation For Placement Of Forms). Af_01/2024Manual Excavation For Crowning Block Or Footing (Including Excavation For Placing Formwork). Baldrame And Running Shoe Using 12.5 Mm Ca-50 Steel Frame, 5 Mm - Assembly. Af_01/2024 - Sinapi, Block Frame Using 5 Mm Ca-60 Steel - Assembly. - Sinapi, Concreting Of Crowning Block Or Baldrame Beam, Fck 30 Mpa, Using Pump - Placing, Densification And Finishing Af_01/2024Concreting Of Crowning Block Or Baldrame Beam, Densification And Finishing Af_01/2024 - Sinapi, Mechanically Excavated Pile, Without Stabilizing Fluid, With. 25Cm Diameter, Concrete Placed By Concrete Mixer Truck (Exclusive Mobilization And Demobilization Af_01/2020_Mechanically Excavated Pile, Concrete Placed By Concrete Mixer Truck (Exclusive Mobilization And Demobilization Af_01/2020_Pa, Mechanical Pulling Of Reinforced Concrete Pile,). Diameters Of Up To 40 Cm. Af_05/2021Mechanical Pulling Of Reinforced Concrete Piles, Diameters Of Up To 40 Cm. Af_05/2021, Block Frame Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024 - Sinapi, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 10.0 Mm Ca-50 Steel - Assembly. Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using
|