|
Installation Of Safety Equipment – Keretserz. Eng., Not Eng. Traffic Commission Work Mon-Mon. Continuation Of Point Ii.1.4) (Field Bt-24): Single-Sided Guide Rail With 4 M Post Spacing, Double-Sided Guide Rail With 4 M Post Spacing, Double-Row Elevated Guide Rail With 4 M Post Spacing, Replacement Of Reflective Prism, Replacement Of Red-Red Reflective Prism With Dg Foil, Replacement Of Red-White Reflective Prism With Dg Foil, Guide Rail End Element, Upper Row Tying The Barrier To The Lower Row With A Transition Element, Construction Of A Barrier Run With A Steel Run-Off Element, Construction Of The End Element Of The Barrier (Carp Tail), Raising The Level Of The Guide Rail, Road Accessories, Road Width Indicator Post, Guardrail For Pedestrians, Guardrail For Cyclists, Paving Signal Body (Klemfix Element). Water Construction; Demolition Of Water Construction Facilities, Demolition Of Bed Lining, Demolition Of Trench Lining, Demolition Of Pipe Culverts, Clogging Of Pipe Culverts, Demolition Of Seeps, Demolition Of Seepage Shafts, Demolition Of Rivers, Demolition Of Culverts, Demolition Of Concrete And Reinforced Concrete Structures, Dismantling Of Culverts, Renovation Of Water Construction Works, Drainage, Culverts, Pipe Culverts 0.4 M < Internal Diameter ≤ 1.0 M, Pipe Culvert 1.0 M < Internal Diameter ≤ 2.0 M, Construction And Repair Of Head, Cross-Section Of Frame Element Culvert ≤ 1.0X1.0 M From Prefabricated Elements, Placement In Protection, Construction Of A Reinforced Concrete Load Distribution Plate Above The Culvert, Pipe Penetration With Starting And Receiving Shaft, Ditch, Channel, Ditch Earthwork Design, Ditch Arrangement, Humus And Weeding Of Trenches, Paving Of Ditches, Production And Placement Of Prefabricated Ditch Elements, Paving Of River, Dyke, Construction Of River From Prefabricated Elements, Production Of Natural Stone Paving, Drainage Border, Copper Gutter, External Drainage Border, Internal Drainage Border, Construction Of Copper Gutter, Leaks, Cross Seepage, Construction Of A Prefabricated Seepage Head, Length-Seepage, Maintenance Of Facilities Necessary For Drainage, Cleaning Of Pipe Culverts, Cleaning And Profiling Of Existing Trenches, Cleaning Of Trenches, Water Management, Drainage Earth Bed, Drainage Earth Bed Earthwork, Drainage Earth Bed Humus, Weeding, Bed Renovation, Drainage Paved Bed, Waterbed Paving With Bed Sheets, Waterbed Paving With Grass-Covered Sheet Paving, Waterbed Paving With Natural Stone, Waterbed Paving With Prefabricated Riverbed Paving Elements, Copper Protection, Construction Of Copper Protection With Stone Mattress, Construction Of Coastal Protection, Making Copper Protection With Prefabricated Elements, Supporting Copper Protection With Sand Plate, Geocell Protection, Copper Protection With Natural Stone, Renovation Of Water Management Facilities, Repair Of Bed Cover, Repair Of Ditch Cover, Repair Of Copper Protection Works. Plant Installation, Environmental Protection; Demolition Of Environmental Protection Facilities, Noise Protection Facilities, Demolition Of Noise-Shielding Walls With Foundations, Weeding, Weeding On A Flat Surface, Weeding On A Copper Surface, Environmental Protection, Noise Protection Facilities, Construction Of A Transparent Noise-Shielding Wall, Construction Of A Noise-Shielding Wall Opaque, Construction Of A Noise-Shielding Wall Opaque, Window Replacement For Sound Insulation Up To 38 Db, Window Replacement For Sound Insulation 38-40 Db, Wind
|