Architectural Design Services – Railway Line No. 80 Sixty Design Tasks. The Planning Tasks Are Carried Out As Follows: Two-Track - Clxxxiii Of 2005. Act § 2. 1.6. According To Point - Standard Gauge Railway Track Design: 64,214 Line Km (Affecting 6 Stations); Number Of Artefacts Affected By Track Modernization: 63; Insurance Equipment And Telecommunications Planning Tasks According To The Planning Disposition: 64,214 Km; Design Tasks Involving Overhead Lines According To The Design Disposition: 64,214 Km; Design Tasks Related To Street Lighting And Energy Supply According To The Planning Disposition; Fet/Heta And Electric Substation Planning Tasks According To The Planning Disposition - Line Kilometer Under The 414/2020. (Viii. 30.) Government Decree Annex 5 Chapter B 7.3. Point 80 Means The On-Site Replacement Of The Superstructure And Turnouts On The 64.214 Km Schedule Length Hatvan A Branch - Hatvan (Kiz) And Hatvan (Kiz) - Füzesabony (Bez) Open-Line Section And The Main Tracks Passing Through The Stations, The Completion Of The Necessary Telecommunications, Safety Equipment And High-Current Works, As Well As, Strengthening/Reconstruction Of The Substructure Of The Railway Track And The Related Artefacts, So That After The Renovation, The Axle Load Of The Railway Track On The Section Is Suitable For 225 Kn And A Speed Of 120 Km/H. Part Of The Program Is Also The Reconstruction Of 250 M Long, Sk+55 Cm High Platforms At Vámosgyörk And Nagyút Stations, As Well As At Adács And Karácsond Stops, Taking Into Account The Current Track Layout/Platform Layout, Treating It As Constraints, And Maintaining The Level Access To The Platforms. In 2015, Between Nagyút (Kiz) And Füzesabony (Kiz) Stations, Only The Open Line And Only The Right Track Was Rebuilt By Strengthening The Substructure And Artefacts, Therefore The Facilities Affected By The Previous Reconstruction Are Not Part Of This Project. Currently, The Authorized Speed Is 120 Km/H, The Authorized Axle Load Is 210 Kn. Based On The Above, During This Public Procurement Procedure, It Became Necessary To Procure Planning Tasks Related To The Investment. Planning Tasks Of The Winning Bidder (As Detailed In The Planning Disposition, Which Is Part Of The Public Procurement Documents): Preparation Of Sectoral Licensing Plans; Preparation Of Other Necessary Plans And Technologies. Preparation Of Specialized Implementation Plans; Preparation Of Other Necessary Plans And Technologies Preparation Of The Technical Volumes Of The Request For Bid Documentation Detailed In The Planning Disposition.
Contact Information
Contact No.
+36 303794178
Email
tanczos.fanni@mavcsoport.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 104047953
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.