|
Paving Rental. Af03/2024, Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), Using A Tracked Tractor. Af03/2024, Horizontal Excavation In 1St Category Soil With Crawler Tractor (170Hp/Blade: 5, 20M3). Af07/2020, Loading, Maneuvering And Unloading Aggregates Or Soil In A 6 M³ Dump Truck Load With A 1.72 M³ Loader And Free Unloading, Transport With A 6 M³ Dump Truck, On A Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af07/2020, Regularization And Compaction Of Predominantly Clayey Soil Subgrade, For Pavement Construction Works. Af09/2024, Bica Corrida, Transportation Of Material From The Deposit To The Track With A 12 M3 Dump Truck On A Paved Floor, Construction Of Base And Sub-Base For Paving Granulometrically Stabilized Soil With Mixture Of Soils On The Track - Exclusive Of Soil, Excavation, Loading And Transport. Af09/2024, Priming With Asphalt Emulsion - Eai, Manual Cleaning, Connection Painting With Rr-1C, Transport With Tank Truck Transporting Asphalt Material Of 20000 L, Dmt Up To 30Km (Unit: Txkm). Af07/2020, Additional For Dmt Exceeding 30 Km (Unit: Txkm). Af07/2020, Execution And Application Of Hot Machined Bituminous Concrete (Cbuq), Commercial Mass, Including Supply And Transport Of Aggregates And Bituminous Material, Exclusive Transport Of Asphalt Mass To The Track, Transport Of Asphalt Concrete From The Plant To The Track With A 12 M3 Dump Truck On A Natural Bed Floor, Guide Laying (Curb) In Straight Section, Made Of Prefabricated Concrete, Dimensions 100X15x13x30 Cm (Length X Lower Base X Upper Base X Height). Af01/2024, Execution Of Machined Concrete Gutter, Cast In Situ In A Straight Section, 30 Cm Base X 10 Cm Height. Af01/2024
|