|
Architectural Project: Preliminary Study With Definition Of Implementation And Access, A Layout Must Be Created With The Arrangement Of The Environments So That There Is Approval From The City Hall Before Starting The Development Of The Project; Situation In Relation To The Urban Perimeter; Preparation Of The Floor Plan, Sections, Facades And Roof; Definition Of Materials, Finishes And Construction Solutions; Compliance With Current Technical Standards, Municipal Works Code And Specific Legislation; Adequacy To Accessibility, Ventilation, Lighting And Security Conditions; Proposal That Harmonizes Unitality, Aesthetics And Economic Feasibility; Present Quantitative., Structural Design, Scope Of Services: Location/Load Plan; Form Plan; Foundation Through Soil Survey; Slabs; Detailed Plan Of The Metal Roof Structure; Quantitative Materials, Hydraulic Project, Scope Of Services: Sizing And Detailing Of Cold Water, Sewage And Rainwater Networks; Quantitative Materials, Electrical Project, Scope Of Services: Dimensioning And Detailing Of Electrical Networks; Atmospheric Discharge Protection System - Spda; Quantity Of Materials, Fire Prevention Project, Scope Of Services: Sizing And Detailing Of Hydrant Networks; Emergency Lighting And Signage; Fire Extinguishers; Other Requirements; Quantity Of Materials., 10/27/2025, Complete Descriptive Memorandum Of All Stages Of The Work With A High Level Of Detail And Calculation Memorandum;, Budget Spreadsheet And Schedule Following The Updated Paranacidade Spreadsheet., Scope Of Services: Location/Loading Plan; Form Plan; Foundation Through Soil Survey; Slabs; Quantitative Materials., Scope Of Services: Sizing And Detailing Of Electrical Networks; Atmospheric Discharge Protection System – Spda, Floor Plans With The Position Of Speakers, Microphones, Connection Points And Cables; Audio Single Line Diagrams; List Of Equipment And Materials; Operation And Maintenance Manual; Quantity Of Materials., Facades; Aesthetic And Functional Design Of The Portal; Definition Of Finishing Materials, Colors And Visual Identity; Compliance With Current Technical Standards, Municipal Works Code And Specific Legislation; Layout Of Accesses, Pedestrian Areas, Lighting And Surrounding Landscaping; Proposal That Harmonizes Functionality, Aesthetics And Economic Feasibility; Definition Of The Typography And Visual Identity Of The City’S Name; Panels, Signs And Official Symbols; Landscaping Treatment Of The Surroundings (Beds, Lawns, Tree Planting, Gardens); Integration With Access Roads And Living Area; Traffic Impact Study (Visibility, Entries And Exits); Installation Of Tacks, Horizontal And Vertical Signage, If The Portal Interferes Directly With The Track; Present Quantitative.Gg, Scope Of Services: Lease/Load Plan; Sizing Of Structural Elements (Pillars, Beams, Roof, Metallic Or Concrete Parts); Form Plan; Foundation Through Soil Survey; Definition Of Connections (Welds, Screws, Reinforced Concrete); Slabs; Quantitative Of Materials., Architectural/Accent Lighting For Portal; Electricity Points And Support Network (Eventual Sockets, Panels, Led Panels); Quantitative Materials.J
|