Solar Panels - Construction Of Renewable Energy Sources In The City And Commune Of Włodowice. 1. The Subject Of The Contract Is The Implementation Of Project Documentation And The Comprehensive Implementation Of The Investment Task Entitled Construction Of Renewable Energy Sources In The City And Commune Of Włodowice. The Order Consists In The Design And Implementation Of Delivery, Assembly And Launching Of The: Photovoltaic - 51 Pcs, Energy Warehouses - 51 Pcs. 2. As Part Of The Subject Of The Contract, The Contractor Will Perform In The Scope Of: 1) Design: Inventory Of The Actual Technical Condition Of The Facilities And Electrical Installation Of Facilities For The Installation Of Pv Systems. The Activities Will Be Prepared For Assembly Arrangements, Which Constitute The Basis For The Implementation Of The Project Documentation, With The Location Of Photovoltaic Modules On The Roof, Facade Or On The Ground With A Placed Place To Mount Hybrid Inverter, Energy Storage, As Well As Containing All Necessary Information As To The Range Of Formalities, Additional Work, Possible Purchases Of Devices, Including Parameters Necessary To Be Carried Out By A Resident In Order To Enable The Installation Of A Photovoltaic Installation And Its Acceptance By Local Dsos. Installation Reports Must Be Signed And Accepted By The Owner Of The Building And The Contractor As Well As Verified By The Supervision Inspector In The Assembly Arrangement Report, An Impassable Deadline For Adaptation Of The Installation Or The Administrative Formalities By The Owner Of The Object Will Be Specified. The Implementation Of The Requirements In Question Is A Prerequisite For Undertaking Assembly By The Contractor, The Development Of Project Documentation For Individual Installations And Its Agreement With The Ordering Party And The Supervision Inspector, 2) Installation: Installation Of Support Structures For Pv Modules, Pv Mounting On Support Constructions, In The Case Of Installation Of Photovoltaic Modules On The Ground, On The Contractor Will Be Layer (Other Than The Ground), Excavation, Up To 40 Meters In A Straight Line From Photovoltaic Modules To The Building In Which There Will Be A Plug Point In The Electrical Installation, Laying The Wiring On The Dc And Ac Side Of The Installation (If Photovoltaic Modules Are Located On The Ground, The Scope Of Work On The Throne Of The Contractor Will Apply To A Maximum Of 40 Meters Of Dc Ababling (In Dc Excavation) Counting In A Straight Line From Photovoltaic Modules To The Building In Which There Would Be A Plug Point In The Electrical Installation), Backfilling Of The Excavation, Alignment And Compacting The Area, Possible Reassembly Or Arrangement Of The Top Layer (Other Than The Ground), Modernization Of The Existing Electrical Switchgear In The Appliance With The Appliance With Pv Micro -Installation, Modernization Of The Existing Electrical Switchgear For Technical Provisions On The Users Side - If Necessary, Assembly Of A Hybrid Pv Inverter, Installation Of Energy Storage, Assembly Of Lightning Protection Installations Or Appropriate Spd Cameras And Distinguished Connections
Contact Information
Address
Krakowska 26
Contact No.
34 315 30 01
Email
urzad@wlodowice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 102784062
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.