|
Siteworks-Blb Nrw D/Düsseldorf/D-New Building Iuf: Pu 001 Construction Site Equipment/Construction Logistics 065-25-00243. Approx. 33,000 M2 Surfaces D 15-20Cm Create Approx. 45,000 M2 Formwork Single Foundation H 1-1.5M Approx. 262,000 M Construction Fence Setting Steel Tube Frames Shutting H 2M Set Up 312,000 Stw. Set Up 1,000 Hours Of Container System. Previous 2-Storey 174,000 Stwo Container System, Maintain, Clean, Keep Standing 80.000 Stwo Container Facility For Recording, Maintaining, Cleaning, Standing Place 200.000 Stwo Containers Of Sanitary Forecast, Maintenance. Frost Protection Layer Storage Space Dpr1 0/45 D 15-20Cm Approx. 500,000 M2 Container Installation Area Restoring Object Monitoring And Medical Container Restore Approx. 3,000 Signage. Kg Of Concrete Mass Steel Desperation To Dn150 2,000 St Construction Water Supply Approx. 25,000 H Construction Water Supply Extension And Conversion Approx. 130,000 M Frost Protection Accompaniment Tw Pe Ad 50Mm Ca: 130,000 M Thermal Insulation Complaint Pipe 180,000 D Mobile Heating Center 180,000 D Mobile Aircraft 1,800,000 L Glycol Mixture For Frost Protection 180,000 H Fuel Management 20,000 St Rescue Sign Lamp With Heating 100,000 St Radio Supplement Module For Lights With Single Battery Approx. 2,000,000 M Rubber Hose Line H07rn-F 3G2.5 Fastening 48,000 Mt Construction Site Safety Lighting 48,000 Mt Construction Site Transformer 400Kva Approx. 100,000 M Installation Tube Alu 63Mm Ap 250,000 St Mounting Lamp 6000Lm 300,000 St Mounting Lamp For Scaffolding 6000Lm 1,000 St Dv Systems Software Software Building Logistics And Set Up 174,000 Stwo Waste Container, Hold 600L Cover. Movable Weekly 176,000 Where Logistics Staff Project Manager Day Class, On Working Days 14H To 1000 Movement. 176,000 Where Logistics Staff Daily, On Working Days 14H To 1000 Movement. 76,000 Where Logistics Personnel Daily, On Saturdays 12H To 500 Movement. Instructions Ag 103,000 Where Logistics Staff Additional Day Class, On Working Days 14H Instruction Ag 5,000 Stmt Digital Camera With Bell Button 5,000 St Video Surveillance Solar Outside Of The Operating Times 500,000 St Construction Site Card. 5Gradc Fuel Heating Oil 3,000 St Warm Air Producers Mobile 298,000 Where Clean During The Construction Phases, 172,000 Where Clean During The Construction Phases, Inside
|