Heating, Ventilation And Air Conditioning Installation Work- Heat And Cold Supply Systems Socket (Ve 060), Cvk, Dhzc. The Charité - University Medical Center Berlin, Charitéplatz 1, 10117 Berlin, Intends To Build A Forward -Looking New Building For The German Heart Center Of The Charité (Dhzc) On Augustenburger Platz 1, 13353 Berlin, In The Southwestern Area Of The Virchow Clinic (Cvk). In The Planned New Building, The Central Sterile Goods Supply (Zsva) And The Central Emergency Room (Zna) Are Housed. A Helipad Is Built On The Roof Of The Building. The Advertised Construction Work Includes The Heat And Cold Supplies For The Base (Levels U2 To E05) For The Newly Built Dhzc Building With The Following Main Features. Heat Supply: -Remove Heat Transfer Stations Each 1,400 Kw (2 St) -Remove Heat Transfer Stations Each 1,200 Kw (2 St) Water -Water Heat Pump For Energy Shift 350 Kw (1 St) Layer Memory 7,000 L (1 St) Distributor/ Collector (3 St) Pressure (4 Hours) Regulator (15 Hours) System Separation Over Plate Heat Transformers (2 Hours) -Hot Water Preparation In The Flow Principle With 2 Buffer Storage Facilities Each 2,500 L (1 St) -Door Air Circulation (10 St) Heating Ceilings Metal Cassettes With Gk -Frieze (9,400 M²) Floor Heating/ Cooling (1,050 M²) Tube Steel Pipe Black Dn100 To Dn200 (950 M) Pipe Lines Black Dn40 To Dn80 (1,900 M) Tube Lines Black Dn15 To Dn32 (1,200 M) Pipe Pipes Stainless Steel Dn65 (600 M) Pipe Stainless Steel Dn32 To Dn50 (2,100 M) Pipe Stainless Steel Dn15 To Dn25 (8,300 M) Tube Radiators (130 St) Plate Radiators (12 St) -Creation And Operation Of The Winter Construction Heating Over Air Heating (60 St) Cold Supply: -Layer Memory 7,000 L (1 St) Cold Transfer With 4 Pump Groups 2,000 Kw (2 Hours) -Distributors (3) Prints (3) St) Control Groups (15 St) Machine Cooling Med. Large Devices (Mri, Ct, Vacuum Pumps) System Separation Via Panel Heat Transformers (7 St) -Blower Confectioners (Approx. 100 St) Hygiene Cassettes (Approx. 25 St) Climate Cabinets (14 St) Connections To The Cold System Of The Campus Within The New Construction Pipeline Black Dn100 To Dn350 (2,500 M) -Black Dn40 To Dn80 (3,200 M) Tube Lines Black Dn15 (800 M) Pipe Pipes Stainless Steel Dn65 (600 M) Pipeline Stainless Steel Dn32 To Dn50 (4,600 M) Pipeline Stainless Steel Dn15 To Dn25 (4,100 M). The Refrigeration Is Provided Via The Campus Network. Both Refrigeration Stations, Each With 2,000 Kw, Are Set Up In The U1 Cold Center. There Are Separate Requirements According To The Berlin Tender And Procurement Law (Berlavg), See Tender Documents. More Information Can Be Found On The Documents Provided On The Charité (Https://Vergestplattform.Charite.De).
Contact Information
Address
Augustenburger Platz 1
Contact No.
+49 00000000
Email
zentrale-vergabestelle-vob@charite.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 102482504
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.