Quotation are invited for Supply, Fabrication and Installation of GTE2 AND GTE3 NG Pipelines from NG Skid to Turbine Hall under Trench DLN Skid Flange. AND INSTALL 10## NG LINE (SS 316L) FOR GTE # 2THE SCOPE OF WORKS: -THE SCOPE OF WORKS UNDER THIS CONTRACT IS REPLACEMENT OF EXISTING HIGHPRESSURE NATURAL GAS (NG) SUPPLY PIPING OF GTE#1 GAS TURBINE OF E PHASE-1 WITHIN TURBINE HALL. PIPING IS DESIGNED FOR 30 BARG P RESSURE ANDTEMPERATURE 60 DEGC. DETAILED SCOPE OF THE WORKS IS LISTED BELOW BUT NOTLIMITED TO,1.#TAKE MEASUREMENT AND LAYOUT DETAILS OF EXISTING PIPING AT SITEINCLUDING MAKING ISOMETRIC SKETCH FOR FABRICATION NEW PIPING.2.#DISMANTLE EXISTING PIPING BETWEEN GT HALL WALL AND GT FUEL GAS KIDOF GTE1. PIPING NEEDS TO CUT FROM NG SHUT OFF VALVE OUTLET LINE ELBOW TOUNDER THE TRENCH INSIDE OF GT HALL. 3.#MATERIAL OF CONSTRUCTION OF THE PIPE STAINLESS STEEL SS 316L, SCH-404.#THE MAIN PIPING IS 10-INCH DIAMETER.5.#ALL WELD JOINTS SHA LL BE BUTT JOINT WITH ROOT TIG WELD AND REMAININGSMAW6.#UNDER THE TRENCH FOR THE PIPE JOINT, MIRROR WELD MAY BE REQUIRED.7.#WELD JOI NTS SHALL BE TESTED 100% BY RADIOGRAPHY AND DYE PENETRANT.THE TESTING WILL BE ARRANGED BY DEWA FREE OF COST. ANY REPAIR WILL BECARRI ED OUT BY THE CONTRACTOR.8.#ALL PIPING SHALL BE INTERNALLY AND EXTERNALLY CLEANED BY SANDBLASTING OR GRIT BLASTING TO SA 21/2 GRADE BEFORE FABRICATION.#MECHANICAL CLEANING WHEREVER BLASTING IS NOT POSSIBLE. TEMPORARYCORROSION PROTECTION MAY BE APPLIED FOR THE INTE RNAL SURFACES IF NEEDED.EXTERNAL SURFACES SHALL BE PAINTED WITH ZINC BASED EPOXY PRIMERIMMEDIATELY AFTER BLASTING.9.#STRAIGHT RAW PI PE, SCH 40, STAINLESS STEEL PIPE AND ELBOW REQUIREDFOR THE JOB WILL BE PROVIDED BY SUPPLIER.10.#GENERALLY, IT IS ASSUMED THAT ALL MA TERIALS REQUIRED TO DO THEABOVE JOB OTHER THAN MENTIONED UNDER ITEM-8 ARE REQUIRED TO BE PROVIDEDBY THE CONTRACTOR. HOWEVER, MAJOR I TEMS CONSIDERED ARE LISTED BELOW.A.#10# SCH 40, 90 DEG SEAMLESS STAINLESS-STEEL ELBOW, FIVE NUMBERSREQUIRED AS PER THE SITE ROUTED P IPING LAYOUT.B.#PIPE CLAMPS AS NECESSARYC.#ALL CONSUMABLES ARE REQUIRED FOR THE JOB ALONG WITH TOOLS ANDTACKLES.D.#HYDRO-TESTING OF THE PIPING TO THE EXTENT POSSIBLE BEFORE TIE-INWITH EXISTING PIPING.E.#PRIMER COATING WITH PAINTING AS PER EXISTING PIPING PAINTINGS PECIFICATION AND COLOR CODE. Qty: 1 Supply, Fabrication and Installation of GTE2 AND GTE3 NG Pipelines from NG Skid to Turbine Hall under Trench DLN Skid Flange. FOR FURTHER DETAILS, PLEASE CONTACT ASM MYNUDDIN (0503620814) MYNUDDIN.HOSSAIN@DEWA.GOV.AE /MARWAN AL MHEIRI (0501136322) (MARWAN.AL MHEIRI@DEWA.GOV.AE), AHMED ZAKARIA (ahmed.eldaly@dewa.gov.ae), 0524781810 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332502403)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 102283826
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.