|
Description Of The Subject Of The Contract. 1. The Subject Of The Contract Is Construction Works Involving The Renovation Of A Container Building For Office For The Celebration Of The Jantar Coast Protection, 82-103 Mikoszewo, Ul. Gdańska 2A, I.E. Demolition Of Floors, Laying New Floors With Insulation Throughout The Facility, Laying Tiles And Waterproof Panels, 1.1. Roof Replacement With New, Flat Roofs (Ventilated) With Insulated Using An Existing Unilateral Fall At The Whole Of The Slope To The East With New Guttering, 1.2. Replacement Of All Windows In The Amount Of 5 Pcs, 1.3. Insulation Of Walls From The Outside With A Substitute For Steel Profiles And A 15 Cm Layered Plate Covering, 1.4. Wall Housing, Room Ceilings (Except The Bathroom) From Gk Biała, 1.5. Replacement Of Existing Electric Radiators And Adding Heating The Central Room With An Adaptation To The Volume, 1.6. Renovation Of The Bathroom - Walls, Ceiling Should Be Enclosed From Green Gk Plates, Walls Are Laid With Stoneware Tiles, Paint Paint Adapted To Wet Rooms In White, Replacement Of The Sink For A Sink With A Padding Cabinet, Replacement Of A Compact Bowl, Shower Replacement With A Shower With A Low Paddling Pool Max 10 Cm High, Shower Cabin Closed With Hinges, Replacement, Replacement, Replacement. Fittings, Purchase And Installation Of A Mirror Above The Sink, Soap Container, Paper Towel Container, Toilet Paper Holder, 1.7. The Implementation/ Purchase And Assembly Of Kitchen Buildings 180 Cm Long, Which Includes Standing And Hanging Cabinets (Agreed With The Ordering Party), A Single -Chamber Sink With A Dehumidifier, A Kitchen Battery, A Underfall Fridge, A 2 Burner Induction Plate Let In A Countertop, Purchase Of A Table And 4 Chairs, Work Sleeves With Tiles, 1.8. Purchase And Assembly Of One Or Two Water Heaters For The Bathroom And Kitchen Depending On The Possibilities Of Electrical Installation, 1.9. Replacement Of Electrical Installation, Number Of Double Sockets About 8 Pcs, Including Nests To Wet Rooms. 1.10. Preparation Of As -Built Electrical Documentation Approved And Signed By A Person With Appropriate Permissions, 1.11. Measurement Of Electrical Installation, 1.12. Replacement Of Lighting For Led Lighting In A Shade Of Neutral Light, 1.13. Replacement Of Water And Sewage System Pipes, 1.14. Replacement Of Interior Doors In An Amount Of 4 Pcs And External In An Amount Of 1 Pc. 1.15. Making A Polycarbonate Roof Above The Entrance, 1.16. Equalization And Covering The Stairs With A Silicon Sand Resin, 1.17. Partial Exchange Of Dehydration Of The Building In Places Where It Is Required And Its Masking, Making A New Drainage On The Eastern Wall, 1.18. Making A New Building Band From A Paving Slab On Three Sides, Except For The Front Page, 1.19. Renovation Of The Door To The Room Under The Stairs, Painting The Foundation With Moisture Protection. 2. A Detailed Description Of The Subject Of The Contract Is Included In The Functional And Usable Program Of Annex 9 To
|