|
As Part Of The Subject Of The Contract, The Work Is Provided For The Work Within Four Tasks That Make Up The Investment Of ,, Improving Water And Sewage Management In The Góra Commune,: Task 1 Modernization Of The Water Treatment Station In Wierzowice Wielkie- Journal Of Laws No. 11/211) Construction Industry: Works Within Building No. 1, Works At Facility No. 2- Concrete Tank For Washings, Land Development; 2) Sanitary Industry: A) Water Installations: Raw Water, Anti-Municipal Water, Anti-Municipal Water. Rinsing From The Filter Hall And Linear Dehydration, Water Water Tanks, Water Treatment From The Tank For A Hydrophore Set, An Emergency Transfer From The Tank + Water Trigger From The Tank, Renovation Of The Existing Deep Well, B) Renovation Of The Water Tank And Rinsing, C) Water Treatment Station Technology: Inside Technology Of The Suw Building, 3) Internal Installations: Internal Installation: Internal Installation: Internal Installation: Internal Installation: Internal Installation: Internal Installation: Internal Installation: Internal Installation Control Switchboards, Measuring Apparatus, Visualization, Other Installations. Task 2 Reconstruction Of The Water Treatment Plant In Ryczno- Journal Of Laws No. 215/61) Construction Industry: A) Demolition Works, B) Renovation Of The Suw Hall Building: Internal Works, Woodwork, Walls, Roof, Innoc) Construction Of A Social Building At The Suw: Social Building, Land Use. Ryczno Water Treatment: Raw Water, Water Treatment For The Network, Washings From The Filter Hall And Linear Dehydration, Treatment For Clean Water Tanks, Water From Tanks For A Hydrophore Set, An Emergency Transfer From The Tank + Water Trigger From Tanks, Sanitary Sewage System From The Social Building, Internal Installations, Demolition And Recovery Of The Reservoir. Water And Washings,- Tank For Rinse 4 Pcs.: Preparation Of The Ground, Protection Of Exposed Reinforcement About 20% Area Total Internal Surface, Making A Drainage Layer Over The Entire Internal Surface, Making A Cut-Off Layer Over The Entire Internal Surface, Making A Repair Layer, Membrane Application, Renovation Of The Outer Surface Of The Tank, Dismantling And Installation Of Accessories Tanks Tanks,- Water Tanks 3 Pcs: Substrate Preparation, Protection Of Exposed Reinforcement About 20 % Total Internal Surface, Making A Cut -Off Layer Over The Entire Internal Surface, Making A Repair Layer, Membrane Application, Renovation Of The Outer Surface Of The Tank - Fireplaces, Dismantling And Installation Of The Accessories Water Tanks, C) Water Treatment Station Technology. 3) Electrical Industry). - Kazimierza Wielki Estate In The Town Of Góraa) Water Supply Network: Dismantling And Renovation Of Road Surfaces, Earthworks, Assembly Works, Preparatory Robots And Construction Service. Task 4 Purchase Together With The Installation Of Devices Of Devices At The Sewage Treatment Plant In Góra Ul. Zielona - Journal Of Laws No. 231: Free -Standing Power Generator, Conta
|