1. The Subject Of The Order Is The Reconstruction Of Voivodship Road No. 964 Class G In Episode 210 Km 1+200.0 - Episode 210 Km 1+228.6 Consisting In The Construction Of A Pedestrian Crossing In Wieliczka, Commune Wieliczka, Along Ul. Lednicka. 2. The Scope Of Work Includes In Particular: Preparatory And Measuring Works: - Measuring Works (Geodetic Arrangement Of Works And As -Built Geodetic Inventory), - Photo Of The Layer Of Fertile Soil, - Cutting Of Shrubs And Trees Together With Transport, Demolition Works: - Demolition Of The Surface, - Demolition Of Concrete Elements, - Demolition Of Horizontal And Vertical Marking, Demolition Of The Fence, Gas Pipeline:- Security Of The Groundwater Gas Pipeline,- Supervision Over Work At The Gas Pipeline Network- Ownership Of Psg Sp. Z O.O., Telecommunications Network: - Replacement Of The Frames And Well Covers, - Supervision Over The Work At The Telecommunications Cucha - Ownership Of Orange, Electrical Network: - Security Of The Equal Electrical Network - Supervision Over The Work On The Power Network - Ownership Of The Wieliczka Salt Mine, Earthworks: - Excavations For The Structure Of The Pavement Surface, Falls, Foundations:- Basic And Auxiliary Foundation From An Unrelated Aggregate Mixture, Surfaces:- Concrete Cube Surface, Gr. 8 Cm On Cement -Sand Bed (New Cube), - Concrete Cube Surface, Gr. 8 Cm On Cement -Sand Bed (Demolition Cube), - Concrete Cube Surface, Gr. 8 Cm On Cement-Sand Bedding (Integration Cube), Finishing Works:- Roadside Hardened With Broken Aggregate,- Humus, Road Marking:- Horizontal Marking With Chlorocham Paint,- Vertical Marking, Street Elements:- 20X30 Cm Concrete Curves And Cement-Pastep. Concrete Bench,- Concrete Rim 30X8 Cm On Cement-Sand Bed And Concrete Bench, Pedestrian Lighting Network:- Drilling Under The Road With Drawing In The Curtain Pipe Average 110 Mm, - Cable Descent, - Boxes Of Boxes, Boards, - Construction Of Ln Lighting Cable Line, - Construction Of Lighting Pillar Stands, - Lighting Luminaire Booms, - Lighting Fixtures + Motion Sensors, - Measurements, Checking, Markings: - Reinforced Foundations And Concrete Structures, - Depositing Dismantled Fences, - Manually (Vapor -Permeable Thin -Layer Plaster, Acrylic Plastering Mass) Other: - Protection Of The Pole Chapel, - Archaeological Supervision Over Earthworks Along With The Preparation Of Documentation. 3. The Detailed Scope Of The Task Should Be Completed In Accordance With A Pre -Works Of Works, Stwiorb And Technical Documentation, Which Constitute Attachments To Swz. Note: Before Starting Work, The Contractor Is Obliged To Develop And Agree In The Provincial Road Board In Krakow, A Project Of Temporary Traffic Organization, Marking And Securing Works During Their Conducting In The Road Lane.
|