|
Civil Engineer Of Full Works With Complementary Charges Civil Engineer Of Full Work With Complementary Charges, Supply And Placement Of Plaque In Galvanized Plate #26, Esp. 0, 45Mm, Dimension (3X1, 5) M, Plotted With Vinyl Adhesive, Posted With 4, 8X40mm Rivets, In Metalon 20X20mm Metal Structure, Esp. 1, 25Mm, Including Self -Clipped Eucalyptus Support Painted With Pva Ink Two (2) Demands, Manual Wall Sanding For Ink Manual Remaining Remaining For Paint Removal, Manual Cemented Floor Demalition Or Deargamation, With Maximum Thickness Of 10Cm, Including Cemented Floor Manual Demolition Or Counterpressed Deargamation, Including Removal And Stacking, Exclusive Transportation And Removal Of Demolished Material, Concrete Manual Demolition, No Concrete Manual Demolition, No Armation, 08/08/2025, Material Transportation With Mao Cart With Less Or Equal Distances Of Any Nature With Mao Cart, With Less Or Equal To 50M Distances, Including Loading/Discharge, Transport Of Demolished Materials Demolished In Cacamba, Exclusive Manual Or Mechanical Load, Removal Of Galvanized Sheet Or Pvc Removal Of Galvanized Plate Or Pvc, With Reuse, Exclusive Transport And Removal Of Removed Material, Manual Removal Of Metallic Ruff, Including Removal, Exclusive Manual Removal Of Metallic Ruffs, Crawling Area With Removal Of Up To Twenty (20) Meters, Exclusive Weeding Or Mocked Manual Ratio Of Area With Removal Of Up To Twenty (20) Meters, Exclusive Weeding Or Manual, Rocada Manual Of Terrain With Rocadeiro Costal, Exclusive And Burning Manual Terrain With Costal Rocker, Exclusive Cemented Floor, Tract 1: 3 (Cement And Sand), Plain Finish, 2 Cm, 0 Cm, 0 Cm, 0 Cm, 0 Cm. Mechanical Cemented Floor, Mechanical Preparation Of Mortar. Af_09/2020, Epoxy Painting In Floor Painting Floor Painting, Two (2) Demands, Including One (1) Epoxi Primer, Vinyl Floor Semi-Flexible, Commercial Type, Esp. 2Mm, Including Sanding And Preparation Of Vinyl Flooring In Semi-Flexible Plate, Including Sanding And Preparation Of The Surface For Settlement And Fixation With Glue, Smooth Rubber Basement, Height = 7Cm, Thickness = 2 Mm, For Mortar. Af_09/2020 Smooth Rubber Baseboard For Mortar. Af_09/ 2020, Concrete Fck = 15Mp, Track 1: 3, 4: 3, 5 (In Dry Cement/ Sand/ Gravel 1) - Mec Preparation Concrete Fck = 15Mpa, 5 (Cement/ Sand Dry/ Brita 1) - Mechanical Preparation With Betherly 400 L. Af_05/ 2021, Returning Floor Return Cm, Thickness Execution Of Interlocking Floor, Thickness 6 Cm. Af_10/2022, Concrete, Alert Or Directional Floor Floor, Applied On Floor (20X20) Cm With Dry Joint, Color See Concrete Podotatile, Red/Yellow Color, Including Seating With Industrialized Mortar, Applied On Floor (20X20) Cm With Dry Floor Podotatile Concrete Podotatile, Application Of Layer And Regularization In Sand For Flooring Intertravated, Excluding Layer Application And Regularization In Sandpicks For Pavement With Interlocked Flooring, Exclusive Compact, Half Wood Wheel (Width = 10 Cm And Thickness = 2 Cm). Supply And Installation Wheel Half In Wood
|