|
Work 1- Removal Of Rubble With Metal Bucket, Including Manual Load And Discharge In Boot, Work 1- Cutting, Cutout And Removal Of Trees Including Roots. & Gt; 5 E & Lt; 15Cm, Work 1- Tapume Clear Plate 6Mm, Work 1- Screen For Works Protection, Mesh 2 Mm, Work 1- Concrete Brush- 30Cm Diameter, 08/05/2025, Work 1- Eleventing Blocks Of Apparent Concrete- 14Cm, Work 1- Standard Sanitary Partition Neocon, Work 1- Demolition Of Masonry In General (Bricks Or Blocks), Work 1- Return Of Divisory- Fib. Madeira, With Metallic Amounts, Work 1- Waterproofing Mortars With Cement, Sand And Hydrofugal, Work 1- Waterproofing Cement And Sand Mortar (Reservoirs And Pools)- Draw 1: 3, 30Mm Thickness, Work 1- Supply Of Metallic Structure, Work 1- Metal Structure For Roofing, Work 1- Double Trapezoidal Tile In Galvanized Steel - E = 0, 8Mm, Lining B, H = 40Mm - Painted 1 Face - Polyurethane Miolo E = 30Mm, 1- Work In Alveolar Polycarbonate With Installed Metallic Structure, Work 1- Coverage Review, Includes Shinging, Ruffles, Gun And Metal Structure, Work 1- Common/ Headed Door/ Headed With Melamine Laminate- 82X210cm, Work 1- Common Plain/ Headed Laminate Melamine Laminate- 92X210cm, Work 1- Fixed Display With Wooden Door, Work 1- Special/ Solid Smooth Door- 62X165- For Sanitary Installations, Type Of Overlap, Type Free-Occupied- 60X65mm, Work 1- Pass Or Window Removal, Work 1- Gorge Type Lock, 55Mm, Intense Traffic, Zamac Knob, Steel Garnishes, Bright Chrome Finish- Including Drilling, Work 1- Review Of Glass And Painting Change, Work 1- Review Of Electrical Installations, Including Lamp Replacement, Lamps, Lamps, Lamps Reactors, Wiring, Pipe And Circuit Breakers, Work 1- Galvanized Steel Pole, Rectum, Flanged, H = 5M With 120W Led Hermetic Lamp With Illumination/Pmsp Approval, Including Masonry Inspection Box 40X40x40cm Of 1 Brick With Concrete Cover, Work 1- Air Conditioned System In Specific Area, Galvanized N.24- 100Cm Development, Work 1- Galvanized Steel Rufo N.24- Development 33Cm, Work 1- A.P.P.P/Cap/Iron Lid/Lid/Lid/30Cm, Work 1- Rigid Pvc Pipe Conductor, Tip And Bag- 100Mm (4), Work 1- Funded Hemispheric Grid- 75Mm, Work 1- Sanitary Basin With White Dishes Coupled Box, Work 1- Honed Sanitary Basin For Patients With Physical Disabilities, Work 1- Individual Disabilities Washing Washbasin, Work 1- Oval Built-In Washbasin, White Tap, Work 1- Individual Mistory Of White Dishes, Downtown, Work 1- Table Tapper With Manual Top, - Gray Gray Swallow- Thickness 2Cm, Work 1- Removal Of Sanitary Appliances, Including Accessories, Work 1- Taps Removal, Work 1- Review In Hydraulic Installations, Including Registration Replacement, Sewage Flow And Passage Box, Work 1- Common Chapisse- Cement And Sand Mortar 1: 3, Work 1- Mixed Mortar, Lime And Sand 1: 4/12, Work 1- Tiles, Joints Mooring Or Prumo- Based On Common Mortar, Work 1-
|