Construction Project Management Services-Fvss_Neubau-Werkstätten_7.713 Project Control According To Aho. The Ferdinand Von Steinbeis School (Fvss) Currently Consists Of The Parts Of The Building A, B, C And D. The Interventions In Component A And B Are To Be Kept As Minor As Possible (Built In 2009, 2-3-Storey). Adjustments / Conversion Measures In The Oldest Component, Component C (Built In 1950S, 4-Storey, Reinforced Concrete Skeleton Construction) Must Be Reduced To The Bare Essentials. The Cafeteria And The Student Residence Room Are To Be Planned In Component C On The Ground Floor. Component D (Year Of Construction Late 1970S) Is To Be Dismantled And The Replacement Building Is Built At The Same Location. Both Structural And Organizational Interim Measures Are Required To Maintain School Operations During The Construction Phase. The Planning Of Demolition And Structural Interim Solutions Are Also Part Of The Project. Sustainability The 4-Storey Building Is Planned As A Wood/Wood Hybrid Building. When Choosing A Material For Construction, Building Envelope And Interior Design, The Output Value Attaches Importance To The Consideration Of The Life Cycle Of The Building. Both The Production Of The Materials And Their Installation As Well As The Dismantling And The Possibility Of Recycling Play A Role Here. A High Degree Of Prefabrication Of The Components Must Be Striving For. According To The Legal Requirements, The New Roof Areas Are To Be Carried Out As Largely As Possible As A Green Roof In Combination With Photovoltaic Systems. In The Competition To Achieve The Climate Goals, The Run -Up Would Like A Conscious Handling Of Resources In The Manufacture, Construction And Operation Of The Building. With The Construction, The Components And The Useful Life Of The Building Materials, The Co2 Emissions Of The Building Are To Be Reduced Sustainably. The Sustainability Criteria In Accordance With Sustainable Construction In Baden-Württemberg (Nbbw) From The State Ministry Of State Development And Living Baden-Württemberg Must Be Taken Into Account In The Further Planning. The Proof, Coordination And Documentation Must Be Provided By The Object Planning With The Work Of The Specialist Planners. Funding Is Promised For The Construction Project In Accordance With The Administrative Regulation Schulbau - Vwv Schulbau. The Application With The Relevant Evidence And Documents Is Expected To Be Received By The Freiburg Regional Council By September 30, 2026. A Suitable Office Is Sought For The Services Of Project Control According To § 2 Aho Issue No.: 9 (03/2020), Project Level 1, Project Level 2 In Parts (Analogous Lph 1-3 Hoai), Areas Of Action A. For Complete Project Level 1 And The Proportionate Project Level 2, 37.5 % Of The Basic Fee According To Aho Are Scheduled. For The Calculation Of The Fee Offer, Can Be Assumed From Eligible Costs (Kg 200 To Kg 700) In The Amount Of Eur 28.0 Million (Without Vat). Propertive Processing Time (From The Order Until The Order Of The Lph 3 Hoai): 19 Months. The Aptitude Criteria Serve To Determine Whether A Bidder Is The Basic Requirements For The Award Procedure
Contact Information
Contact No.
+49 7461 926 2312
Email
franz.herbst@landkreis-tuttlingen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 100183614
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.