Expansion Of Poviat Road No. 4116W Ul. Promykowa And Poviat Road No. 4115W In The Town Of Wilkowa Village And Czarnów, Commune Leszno: 1) Demolition And Preparatory Works: Reconstruction Of The Route And Altitude Points, Mechanical Dismantling Of The Surface From Mineral And Bituminous Mixtures Gr. 4 Cm (Destruct The Property Of The Investor - Location Of The Ordering Party: Ul. Okrętna 15, 05-850 Umiastów), Demolition Works: Foundations, Surfaces, Curbs, Edges, Sewage, Culverts, Bus Shelters, Road Markings, Fences, Gates, Cutting: Trees, Groves And Shrubs Along With The Protection Of Trees And Bushes For The Period Of Work For The Period Etc., Removal And Utilization Of Materials From Demolition. 2) Renovation Works Taking Into Account The Connection Of The Existing Surface Of The Municipal Road With A New Construction Of The Municipal Road Surface: Milling Of The Surface Of The Gr. Variable In Accordance With The Design Documentation (Destruct The Property Of The Investor - Location Of The Ordering Database: Ul. Okręna 15, 05-850 Umems), Arrangement Of Structural Layers In Accordance With Design Documentation. 3) Earthworks: Excavations, Forming And Thickening Of Embankments. Dna Of Road Ditches, Culverts, Retention Reservoir Together With The Assembly Of Stairs And Railing, Sewage Outlets, Sewage Wells, Sewage Inlets, Line Drainage, Inspection Wells, Sewers. 5) A) Road Surface-Municipal Road Intake Structural Surfaces, Reinforced Substrate Layer: Cement Stabilized Ground Rm = 5.0Mpa (Doseberry. ~ 100%) Gr. 20Cm, Foundation Made Of Broken And Stone Aggregate 0/31.5 Mechanically Stabilized Gr. 15 Cm, Mechanical Cleaning And Sprinkling Asphalt Emulsion Of The Foundation Of Broken Aggregate And Bituminous Surfaces, Binding Layer Of Asphalt Concrete Ac 16W Pmb (25/55-60) Gr. 8 Cm, Ac 11S Pmb (45/80-55) Asphalt Layer. 4 Cm. 10Cm, Foundation Made Of Broken And Stone Aggregate 0/31.5 Mechanically Stabilized Gr. 15 Cm, The Holland Concrete Surface Of The Gr. 6 Cm On Cem Bedding. - Sand. 1: 4 Gr. 4 Cm, Welds Filled With Cement Mortar, Sand, Yellow Tiles With 30X30 Cm Tiles 6 Cm. 7) Public Conventions Surface: Correction, Profiling And Compaction Of The Substrate Under The Structural Layers Of The Surface, Reinforced Substrate Layer: Cement Stabilized Soil Rm = 5.0Mpa (Doseberry. ~ 100%) Gr. 15Cm, Foundation Made Of Broken And Stone Aggregate 0/31.5 Mechanically Stabilized Gr. 15 Cm, Behaton Concrete Cube Surface. 8 Cm On Cem Bedding. - Sand. 1: 4 Gr. 4 Cm, Welds Filled With Cement Mortar- Sand. 8) Surface Of Individual Conventions: Correction, Profiling And Compaction Of The Substrate Under The Structural Layers Of The Surface, Layer Of Reinforced Substrate: Soil Stabilized With Cement Rm = 5.0Mpa (Dzariarn. ~ 100%) Gr. 10Cm, Foundation Made Of Broken And Stone Aggregate 0/31.5 Mechanically Stabilized Gr. 15 Cm, The Holland Concrete Surface Of The Gr. 8 Cm On Cem Bedding. - Sand. 1: 4 Gr. 4 Cm, Joints Filled With Cement Mortar The Contracting Authority
|