Contract Award Notice |
|
TRR | 9334131 |
Organization | Paschimanchal Vidyut Vitran Nigam Limited |
Tender No | E-TENDER NO-81/2022-23 |
Funded By | Self-Funded |
Country | India , Southern Asia |
Contract Value | 186,680 |
Work Detail |
Work Of Deposit Scheme Against Passed Estimate From R.Tender Under Jurisdiction Of Edd-4, Shamli-1.01 Transportation Of Pcc / Stp Polo From The Corporation Store To The Workplace, Which Includes Loading And Unloading On Both Sides. Distance 0 To 80 Km. 1.02 Transportation Of Polo Line Material From The Corporation Store Center To The Workplace, Which Includes Loading And Unloading On Both Sides. Distance 0 To 40 Km 1.03 Transportation Of 25 / 63 Kva Converters From Corporation Store Center To Work Site Which Includes Both Side Loading And Unloading. Distance 0 To 40 Km Raspo''''s Standards According 1.04 1.05 Complete Work Of Erecting Double Pole On Pcc / Stp Polo In Which All Cosarm Clamps, Insulators Etc. Are Installed According To The Drawing And After That The Complete Work Of Filling The Pit. Complete Work Of Erecting Pcc Pole According To The Standards Of Raspo, In Which All Cosarm Clamps, Insulators Etc. Are Installed According To The Drawing And After That The Complete Work Of Filling The Pit. 1.06 Transportation 1:16, 3X50, 395 Abc Conductor Including Both Side Loading And Unloading Distance From Corporate Stores Center To Work Site Distance 0 To 40 Kms 1.07 Laying, Lifting And Sagging Of Ab Sathi Conductor ( 1X16, 3X50x3x95 Mtr ) Cable On Ht Lt Line As Per Corporation Rules. Abc On Lt Line As Per Corporation Rules On The Polo After The Conductor Is Pulled Connection By Tying Distribution Box Etc. Complete Work Of Getting The Line Started. 1.08 Laying Acsr Vessel / Dang Wire On Ht / Lt Line As Per Corporation Rules, 1.09 To Start The Line By Lifting And Sagging. 1.10 25 / 83 Kva As Per The Norms Of Raspo. Complete Work Of Energizing The Converters. As Per The Rules Of The Corporation, As Follows On The Old Lines 1.11 Pull Loose Wire. 1.12 A-Ht Line B- Lt Line 1.13 Earthing Work By Installing Earthing Road As Per The Norms Of Raspo 1.14 According To The Norms Of Raspo, The Stay Road Should Be Drawn And Do Grouting. 1.15 According To Corporation Rules, Straight And Oblique Polo , Doing . 1.16 The Following Material Will Be Provided By The Tenderer For The Above Work. Double Pole Clamp 1.17 Stay Insulator 1.18 Stay Road Clamp 1.19 Nut And Bolt Doublemank 1.20 Grouting Material 1.21 Distribution Box Clamp |
Key Dates |
|
Contract Date | 19 Nov 2022 |
Contact Information |
||||||||||||||||||||||||||||||||||||||||
View Notice Now...Login with your Social Account for Instant Access to this notice
|