Contract Award For Germany-Munich: Electrical wiring and fitting work Network cabling: - KAT 7 Network line CA 7 000 m, - LWL Cable CA 400 m, - Installation cable 2 x 2 x 0.8 to 4 x 2 x 0.8 approx 7 000 m, - Installation cable 10 x 2 x 0.8 to 50 x 2 x 0.8 Ca 1 000 m, - Installation cable Functional content E30 2 x 2 x 0.8 to 8 x 2 x 0.8 approx. 1 000 m, - Devices for image and sound recording and reproduction, - ELA central For the whole building about 1 piece, - Speaker CA 140 pieces, - pressure chamber speaker outside about 8 pieces, - Beamer approx. 3 pieces, - large displays about 12 pieces, - sound system in the hall on Dante technology 1 piece, - Inductive hearing loop in the room Ca 1 Piece, - Electric lamps and lights, - Interior lights CA 500 pieces, - Outdoor lights / Bollard lights / mast lights CA 40 pieces, - Installation of telephone centers, - IP telephone center Ca 1 piece, - DECT telephones approx. 40 pieces, - IP door phone with video surveillance CA 2 Piece, - IP door intercom Central Ca 1 piece, - lightning protection work, - lightning protection system with fishing lines / derivatives about 1 500 m, - Insta LLATION OF ELECTROES, - NSHV CA 1PC, - Subdistributions CA 20 Pieces, - Electrical Installation Channel Plastic CA 400 m, - Cable Cleans sheet steel CA 3 000 m, - Cable Surf Sockets CA 100 pieces, - Core bores CA 40 pieces, - empty pipe laying in the outdoor area approx. 2500 M, - Switch CA 400 pieces, - Sockets about 900 pieces, - CEE sockets Outside and interior approx. 20 pieces, - Motion detector about 150 pieces, - Line quantities about 35 000 m, - KNX Installation for lighting and shading, - KNX actuators approx. 80 pieces, - KNX controls about 80 pieces
|