Unit 1 Esp Overhauling Work , Dry Cleaning Work . Dry Cleaning Of Esp Starting From Esp...


Contract Award Notice

TRR 4965903
Organization West Bengal Power Development Corporation Limited
Tender No WBPDCL/SGTPP/NIT/E1533/20-21
Funded By Self-Funded
Country India , Southern Asia
Contract Value 2 Million

Work Detail

Unit 1 Esp Overhauling Work , Dry Cleaning Work . Dry Cleaning Of Esp Starting From Esp Inlet Duct To Esp Outlet Duct , All Esp Hoppers , Gas Distribution Screens , All Emitting Electrodes And Collecting Plates And Other Allied Zones . , Water Washing Work . Water Washing Of Total Esp Internal , Including All Hoppers , Collecting Plates , Emitting Electrodes And Other Allied Zones . At The Time Of Water Washing If Any Chocking Found In The Hoppers , The Choking Shall Be Cleared Immediately . , Ash Cleaning & Evacution The Total Ash Cleaning / Removing / Evacuation From Beneath Of The Esp Hopper Area After The Esp & Its Hopper Cleaning By Water . Also Esp Inlet & Outlet Duct Ash Deposited In The First & Last Hopper Respectively Are To Be Evacuated From Beneath Of The Esp Hoppers . The Ash Has To Be Disposed Within 2Km Premises Inside The Plant . The Disposal Location Shall Be Defined By Controlling Officer , Fixing / Repairing & Realignment Of Collecting Plates At Suspension Point And Sock Bar Portion Of Esp Fields As Per Requirement . , Gap Adjustment Of All Plates . Through Checking Of Collecting Plates ( Top To Bottom ) And Straightening Of All The Collecting Plates Of 28 Nos . Of Esp Fields . Gap Adjustment Of All The Plates ( Between The Collecting Plates ) Of All The Esp Fields . Inspection And Replacement Of Electrodes ( 1St , 2Nd & 3Rd Fields Having Multipeaks And 4Th , 5Th , 6Th & 7Th Fields Having Spring Wires ) Etc . Field Alignment . , Crm System . Checking And Rectification Of Collecting Rapping System Of All The Esp Fields Thoroughly . , Erm System . Checking And Rectification Of Emitting Rapping System Of All The Esp Fields Thoroughly . , Shaft Insulator System . Replacement / Repair & Cleaning Of Shaft Insulator And Its Heater . Area Like Boilerdrum Floor Vent Flush Box And Drain Related Pipe Etc . ( Running Meter ) . , Support Insulator System . Replacement / Repair & Cleaning Of Support Insulator And Its Heater . , Hopper Heater . Replacement / Repair & Cleaning Of Hopper Heater . , Gd Screen . Replacement / Repair & Alignment Of Inlet Gd Screen ( Three Stages ) . , Anvil Pads . Replacement / Re-Fitting Of Anvil Plate Of The All The Collecting Plates Of Esp Fields , If Required After Checking . , Crm & Erm Systems . Replacement / Repair & Alignment Of Rapping Shafts , Bearings , Pin Wheel , Hammer Assembly Of All The Rapping Mechanism ( Collecting & Emitting ) , If Required After Checking For All Esp Fields ( 28 Nos ) . , Shock Bar System . Repair Of Shock Bar And Also The Alignment Of The Shock Bar . , Baffle Plates . Refitting / Repair Of Baffle Plates Of All The Esp Hoppers ( 56 Nos ) Thoroughly . , Crm & Erm Gear Boxes . Lubrication Of Collecting And Emitting Rapping Motor And Its Gearbox . , Esp Fields . After Completion Of Aforesaid Jobs , Meggaring Of Each Field To Be Carried Out Until It Comes To Its Desired Value . , Tr Sets . The Entire Transformer # Rectifier Units Should Be Checked Thoroughly And Cleaned Body Only Including Checking Of Oil Level And Changing Of Silica Gel Depending Upon The Condition Then . , Hv Safety Bkrs . Alignments Of All The Safety Breakers , 28Nos . ( 1 For Each Field ) Should Be Checked & Rectified . These Must Also Be Cleaned . , Esp Mcc Panels . All The Mcc Panels ( 28Nos . ) Of Esp Fields & Its Incomer Breakers ( 12 Nos . ) Including 6 . 6 Kv / 415V Dry Type Transformers ( Three Nos . ) To Be Cleaned & Tightness Checked . , Suspension Frame & I-Beam . Checking & Maintenance Of Collecting & Emitting Suspension Frame And I-Beam Of A-Path & B-Path . Suspension Point Of Collecting Plate And Emitting Wire Also To Be Checked . , Esp Manhole Doors . Inspection And Repair Of All Manhole Doors Of A-Path & B-Path . , Painting Works . Painting Of All Outdoor Equipments Of Esp . Furnace Wall , Roof Tubes Etc . , Esp Hopper Walls . Inspection ( De-Metering ) And Repair Of Hopper Walls By Scaffolding Of 1St 02 Rows . , Guide Vane . Checking , Repair / Replacement And Strengthening Of Guide Vane Of Esp Inlet Duct .

Key Dates

Contract Date 27 May 2021

Contact Information

Company Name
Awarded Bids List
S.No Bid Number Bidder Name Awarded Currency Awarded Value
1 2103073 TECHNO ENGINEERING INR 1339600.00
'
Contract Value 2 Million
Contract Date 27 May 2021

Complete details of the selected Tender
Organisation Name : Vijaya Bank
Organisation Type : Public Sector Banks Ministry : Ministry of Finance
Tender Ref. No : DIT/DELHIARMB/07052016/1
Tender Title : E-Auction Sale Notice for the properties of M/s Guru Kripa Iron Trading Pvt Ltd, mortgaged to Vijaya Bank and taken possession under the provisions of SARFAESI Act 2002.
Product Category : Land/Building
Sub Category :
Tender Value (INR if not mentioned):
Rs 1,62,00,000/-
EMD :
1620000
Document Cost :
0
Tender Type : Auction
Location : Delhi
First   
Announcement Date :
5-July-2016  
Publication Date on Portal: 5-July-2016 At : 8:03:09 PM  
Last Date of Document Collection :  
8-August-2016 Up To : 5:00 PM  
Last date for  
Submission :
8-August-2016 Up To : 5:00 PM  
Opening Date : 10-August-2016 At : 11:00 AM  
Work Description :
Pre-Qualification :
PreBid Meet Date : --
Tender Document : View Document *
Bid Document : Document Not available
Tech. Document : Document Not available
Sector : Banking, Finance & Insurance
State : Karnataka
 
For further Information Contact:
Name : Santhosh Aili
E-Mail : cbsprog11@vijayabank.co.in
Phone Office : 08025584066
Fax : 08025582747
Address :
City : Bangalore

  download Adobe® Reader®
Adobe® and Get Adobe® Reader® logo are trademarks or registered trademarks of Adobe Systems Inc. in the US and/or other countries.

View Notice Now...

Login with your Social Account for Instant Access to this notice


Tell us about your Product / Services,
We will Find Tenders for you